BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Marine Corps Air Station Cherry Point, North Carolina. Completed plans call for site work for a military facility.

As of 01/24/2022 This project has not been awarded. The work includes the installation of containment curb and gutter with associated cast in place concrete sump, Post Indicator Valve, 4" CL50 DIP, cut-in connection of 4" DIP to existing burn pit drainage piping, full depth removal of surrounding bituminous asphalt pavement with subsequent installation of 4" of NC DOT specification compliant asphalt base and top courses to the limits shown in the project plans and as described in the documents, and incidental related work. NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction Contractors, 39.5 Million Contract Completion Date: 180 days after award Estimated Cost Range: Between $200,000 and $500,000 Wage Determination: General Decision Number: NC20210091 01/01/2021 Liquidated Damages: $231.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price, with Options Requests for Information (RFIs): RFIs must be submitted by the prime contractor to ericka.j.bishop.civ@us.navy.mil and linda.b.clark14.civ@us.navy.mil. The cut off for RFIs is 18 December 2021 by 9:00 AM EST in order to process all inquiries by the proposal due date. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within ten (10) days from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. The deadline to submit pre-award RFIs REMAINS 18 December 2021 at 9:00 AM. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work includes the installation of containment curb and gutter with associated cast in place concrete sump, Post Indicator Valve, 4" CL50 DIP, cut-in connection of 4" DIP to existing burn pit draiange piping, full depth removal of surrounding bituminous asphalt pavement with subsequent installation of 4" of NC DOT specification compliant asphalt base and top courses to the limits shown in the project plans and as described in the documents, and incidental related work.

Post-Bid

Military

$500,000.00

Public - Federal

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
20
Bidding Soon
336
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

February 18, 2022

img_map_placeholder

To Be Determined, Marine Corps Air Station Cherry Point, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.