BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2021 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Marrero, Louisiana. Contact the soliciting agency for additional information.

Product Category:30241700 tent - Brand: Ohenry Tent or Equal - Model: FTWC40X60TF or Equal - Complete West Coast Frame Tent - Material Type: Vinyl - Top Weight: Heavy-duty minimum 17 oz. - maximum 20 oz. top - Welded steel corners, center crown and side fittings - Minimum 2" - Maximum 4" 6005 T-5 schedule 10 anodized marine aluminum tubing - Frame parts attach together with pins - Straps and buckles sewn in minimum 32 oz. - maximum 35 oz. of material Fully reinforced patches at wear points - Curtain rope double reinforced - Rust-resistant buckles - Tent Size: Minimum: 40' L x 60' W / Maximum: 42' L x 62' W - NFPA 701 Certified - 1 Year Manufacturer's Warranty - Includes: Solid White Top w/ White sidewalls & cathedral windows, Frame, Stakes and Guy Ropes, Step-by-Step Instructions, & Storage Bag

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
126
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

January 21, 2022

Project location map

5501 Westbank Expy, Marrero, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.