BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Greenville, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Package Questions Call: James Atkins 3001 I-30 East Greenville, Tx 75402 903/453-3107 Length: 0.3290mi Time for Completion: 229 Working Days ETBDBE Goal: 0.0 % County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Hunt 0901-22-117cr 2132 Crbr 2021(523) at East Caddo Creek Branch Length: 0.0560 Miles Hunt 0901-22-118cr 2132 Crbr 2021(523) at East Caddo Creek Length: 0.11 Miles Hunt 0901-22-119cr 1031 Crbr 2b20(079) at Hickory Creek Tributary Length: 0.0930 Miles Hunt 0901-22-120cr 1032 Crbr 2021(201) at Hickory Creek Tributary Length: 0.07 Miles For Questions Regarding a Proposal Call 512/416-2498 TXDOT - Bridge Replacement

Award

Bridges / Tunnels

$1,348,336.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
197
Bidding Soon
3,936
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

March 7, 2022

Project location map

Multiple Locations, Greenville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.