Site work and asbestos abatement for an educational facility in Pontiac, Michigan. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Bid security in the form of a Bid Bond by a T-listed bonding company licensed to do business in the State of Michigan, Cashier's Check, or Certified Check in the amount of 5% of the bid amount shall be submitted with the bid proposal. Performance and Labor and Material Bonds will be provided upon award. Familial and Iran Statements must be submitted with bid proposal. Bids shall remain firm for acceptance for a period of 60 days. The School District of the City of Pontiac reserves the right to accept or reject any and/or all bids. The Contractor is responsible for all measurements. Measurements for bidding purposes as well as material procurement are the sole responsibility of the Contractor. The Maps included within this specification may not identify all materials listed in the Scope-of-Work. The Scope-Of-work may not identify all materials on Maps. The Contractor is responsible for abatement of all materials whether identified in the Scope-ofWork, the maps or not. The Contractor shall be responsible for moving any non-fixed item in the work area. The Contractor is responsible for returning the work area to the Owner in a condition that satisfies the Owner and the Owner's representative. The Owner shall provide necessary utilities whenever possible. The Contractor shall be responsible for providing any necessary utilities (for Contractor and Owner's Representative) to complete the projects as scheduled, if not provided by the Owner. Complete decontamination chambers with showers shall be constructed for all projects. The Owner and the Owner's Consultant must approve the decontamination chamber location, bag out location, Air Filtration device (AFD) placement and dumpster location. The Contractor may construct a bag out area to facilitate disposal of the materials. The bag out chamber (2 chambers) shall be constructed of wood frame and plywood and shall be sealed with polyethylene (walls/floors/ceilings). The bag out area shall have a wood door with lock. The Contractor shall be responsible for the security and safety of the building. Wood with cutouts for exhaust duct shall be placed in doors and windows. The Contractor shall secure the wood in the doors and windows to ensure a secure work area. The Contractor is responsible for any damage to surfaces, electrical and mechanical equipment. The Contractor shall be responsible for repairing (painting) surfaces: walls, ceilings, floors, windows, doors etc. The Contractor is responsible for all damage resulting from removal operations. All wires shall be properly adhered with cable ties to appropriate hangers. If a Vac Loader is used, the personnel operating the Vac Loader, its placement and standard operating procedures must be approved by the Owner's Representative. Fiber drums shall be utilized for floor tile disposal. They shall have had no hazardous substances placed into them. All drums must be clean and free of hazardous labels when they arrive on the project site. Floor tile and mastic must be placed into lined fiber drums. All areas shall be encapsulated with clear encapsulant. The Workers shall wear PAPRs. The Contractor shall supply a manometer and will be required to maintain a minimum negative pressure of .02 inches of water equivalent. In addition, the Contractor must smoke test the enclosure daily at a minimum. Six sided locked dumpsters only - no open top dumpsters. Dumpsters must be removed from the premises within one day of project completion. No bladder bags may be used without the permission of the Owner or Owner's Representative with conditions. The Contractor shall provide utility lighting for all work areas. No salvaging, by the Contractor or their employees, of any item. The Contractor shall construct wood frame and plywood barriers at all locations requested by the Owner or Owner's Representative. The Contractor will be required to construct an enclosure that satisfies all the requirements of Appendix F of OSHA 1926.1101 "Work Practices and Engineering Controls for Major Asbestos Removal, Renovation and Demolition Operations. PONTIAC MIDDLE SCHOOL BID 1 PHASE 1 Start Date: March 14, 2022 Completion Date: March 18, 2022 PHASE 2 Start Date: June 20, 2022 Completion Date: June 24, 2022 PHASE 3 Start Date: June 23, 2022 Completion Date: July 8, 2022 PHASE 4 Start Date: July 1, 2022 Completion Date: July 15, 2022 PHASE 5 Start Date: July 1, 2022 Completion Date: July 15, 2022 PHASE 6 Start Date: July 8, 2022 Completion Date: July 22, 2022 PHASE 7 Start Date: July 15, 2022 Completion Date: July 29, 2022 ALTERNATE 1 Start Date: March 28, 2022 Completion Date: April 1, 2022

Bid Results

Educational

$179,244.00

Public - City

Asbestos Abatement, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
75
Bidding Soon
1,375
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2021

March 14, 2022

img_map_placeholder

1275 N Perry St, Pontiac, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.