Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Southlake, Texas. Conceptual plans call for site work for a water / sewer project.
Funding is planned for engineering design and construction to replace existing 12-inch, 10-inch, and 8-inch interceptor lines with 15-inch and 10-inch lines in Basin N-12 and N-12a along Dove Creek south of State Highway 114. This sewer line crosses State Highway 114 to serve the Milner Tract, Methodist Hospital, Summerplace, and Chapel Downs. JUSTIFICATION: Identified on the Wastewater Master Plan as undersized for projected development due to demands. Up-sizing the existing interceptor will increase area capacity and eliminate the possibility of future sanitary sewer overflows. ALTERNATIVES / IMPACTS IF PROJECT IS NOT FUNDED: If not funded, the interceptor may not meet capacity demands and may overflow. Alternative being invest in lift station(s) or additional interceptor. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of December 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$3,400,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2027
TX-114, Southlake, TX
Related To This Project
Southlake, TX
--
Southlake, TX
--
Southlake, TX
Bid Date: Nov 01 2023
Southlake, TX
Bid Date: Mar 15 2023
Southlake, TX
--
Southlake, TX
--
Southlake, TX
--
Southlake, TX
--
Southlake, TX
Bid Date: Jul 26 2022
Southlake, TX
Bid Date: Jan 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.