Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Clearwater, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
As of July 5, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 07 Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance : $500,000.00 SR590/Drew St fr Osceola Ave to US19 TRC Members (Subject to Change) : Brian Shroyer Craig Fox Megan Miller The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. SR590/Drew St from Osceola Ave to US19 All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Supervisor, Marilyn Jones 813-975-6628. Financial Management Number(s) 445681 1 32 01 Shortlisted Firms will be provided with the RFP on or before 12/28/2021. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: 01/10/2022 Tentative Oral Presentation Date: 01/13/2022 Shortlist Selection Date/Time 12/27/2021 08:00 pm Oral Presentation Date/Time 1/13/2022 Final Selection Date/Time 1/31/2022 08:00 pm Negotiations Period Begin Date 2/08/2022 Negotiations Period Ending Date 3/10/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR590/Drew St from Osceola Ave to US19
Conceptual
Roads / Highways
$6,886,094.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2024
FL-590, Clearwater, FL
Related To This Project
Clearwater, FL
--
Clearwater, FL
Bid Date: Aug 19 2021
Clearwater, FL
Bid Date: Jun 30 2022
Clearwater, FL
Bid Date: Jul 18 2022
Clearwater, FL
Bid Date: Jul 18 2022
Clearwater, FL
--
Clearwater, FL
Bid Date: Apr 14 2021
Clearwater, FL
Bid Date: Jul 13 2022
Clearwater, FL
Bid Date: May 30 2019
Clearwater, FL
Bid Date: Jun 18 2019
Clearwater, FL
Bid Date: Jun 14 2022
Clearwater, FL
Bid Date: Jun 23 2022
Clearwater, FL
Bid Date: Oct 22 2019
Clearwater, FL
--
Clearwater, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.