BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Mascoutah, Illinois. Completed plans call for site work for a transportation facility; for paving for a transportation facility; water / sewer project; for outdoor lighting for a transportation facility; road / highway; and road / highway.

As of February 22, 2024, this project was completed in the summer of 2023. St. Clair County, Illinois, through the Public Building Commission, hereby gives notice that sealed bids will be received from bidders for the Construct Taxiway Lima and Taxiway Lima Bridge project at MidAmerica St. Louis Airport. St. Clair County promotes equal opportunities and encourages participation by Disadvantage Business Enterprise and Small Business firms. This project includes but is not limited to construction of new Taxiway Lima, including the Taxiway Lima Bridge, Construction of the extension of the Airside Service Road, drainage improvements, security system improvements, installation of new edge lights and other electrical improvements, installation of new perimeter fencing and gates, taxiway and roadway markings, seeding/sodding/mulching and other erosion control measures. Questions regarding bids shall be directed to Contract Administrator, Alice Tejada, by email at alice.tejada@flymidamerica.com. Deadline for questions is 2:30 p.m., Monday, January 24, 2022. : Prospective bidders who desire to submit a bid as a prime contractor must be prequalified with the Illinois Department of Transportation. The prime contractor and subcontractors performing work on the following work items shall also be prequalified with the Illinois Department of Transportation: concrete paving, bituminous paving, aggregate base, electrical pay items and bridge construction. No bid will be considered unless accompanied by a certified check or cashier's check on any bank or trust company insured by the Federal Deposit Insurance Corporation, payable to the OWNER, for not less than five (5) percent of the total amount of the Bid, or by a Bid Bond secured by an approved surety or sureties, payable to the OWNER, for not less than five (5) percent of the total amount of the Bid in accordance with the Instructions to Bidders. The bid deposit shall be separate from the bid guaranty. The owner has established a contract completion date of July 1, 2023. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed in the project manual. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price at the time of contract execution. No Bid shall be withdrawn for a period of 45 days after the scheduled opening of the Bids without the consent of OWNER. OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding, or to accept the Bid or Bids, which best serves the interests of OWNER. CONTRACTORS shall be required to pay not less than the highest prevailing wage rates on the project as established by the State of Illinois, Department of Labor. Project Wage Rates can be found in Section 3, Part C. The proposal must be made on forms provided within the electronic version of the project manual. The Proposal Form must be printed and submitted as part of the contractor's bid. Bidders must supply all required information prior to bid deadline indicated.

Occupancy

Transportation Terminals

$37,513,287.00

Public - Federal

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
825
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 8, 2022

img_map_placeholder

9656 Air Terminal Dr, Mascoutah, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.