BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Cole Camp, Missouri. Completed plans call for site work for a water / sewer project.

The bid opening was postponed indefinitely as the City Offices had to close. The Information for Bidders, Form of Bid, Form of Contract, Plans and Specifications, Bid Bond, Performance Bond, Payment Bond and other Contract Documents may be examined at the following: City of Cole Camp, 401 W Main Street, Cole Camp, MO 65325 MECO Engineering Co., Inc., 2701 Industrial Drive, Jefferson City, MO 65109 The Proposal shall be accompanied by a certified or cashier's check drawn on a solvent Missouri bank or trust company made payable to the City of Cole Camp, MO, or a Bid Bond issued by a surety licensed to conduct business in the state of Missouri and appearing on the U.S. Treasury Department's most current list (Circular 570, as amended), in the amount of not less than five percent (5%) of the total bid. The Bid Bond may be retained by the City of Cole Camp, MO, as a guaranty that if the Proposal is accepted, the bidder will execute the Contract and file an acceptable Performance Bond and Payment Bond within fifteen (15) days after the award of the Contract. Bidders on this Work will be required to comply with the Copeland (Anti-Kickback) Act, and the Contract Work Hours and Safety Standards Act, as indicated in the Contract Documents. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidders shall be determined for each Contract by summarizing the applicable low base bids. The City of Cole Camp, MO reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids. A. This contract includes but is not limited to the following items of work, which are listed for the convenience of the Contractor in understanding the intended scope of work: 1. Installation of 8-inch PVC SDR 35 Sanitary Sewer Main 2. All items incidental to total completion

Award

Water / Sewer

$28,734.00

Public - City

Site Work

6

19

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
32
Bidding Soon
503
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

July 20, 2022

img_map_placeholder

Multiple Locations, Cole Camp, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.