BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Spartanburg, South Carolina. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

The Spartanburg County Parks Department is seeking sealed proposals from qualified vendors to demolish existing asphalt walkways and install new asphalt walkways on the Wadsworth Trail and inside of Cleveland Park. a. Work to be included shall include all material, labor, and construction coordination and control necessary to deliver complete and suitable for public use the following: i. Demo and remove existing Asphalt Walkways ii. Minimal Grading iii. Hard improvements including Asphalt Walkways b. The County will meet the contractor on site to mark and measure all sections of the trail to be demolished prior to the start of construction. Any changes in linear footage will be addressed in a change order prior to the start of construction. The trail unit cost amount provided on page 16 will be used for the change order. It is the County's intent to at least demolish and replace 1200 LF of trail. The County hopes to replace more trails depending on the price. c. The contractor will be required to demo, remove, and repave portions of the existing asphalt walkways on the Wadsworth trail and inside of Cleveland Park. i. The Wadsworth trail is located at 501 Willis Road in Spartanburg, SC. It is not located in the City limits of Spartanburg. The Wadsworth trail is an existing 6' wide asphalt trail and has an earth subgrade. The contractor is to remove the existing asphalt, preserve, compact, and/or level existing earth subgrade, and apply a new 3" asphalt top course. The cross slope on the trail is to be 2% or less slope to shed water. The Park Maintenance department will mark which sections of the trail will need to be removed and replaced. ii. Cleveland Parks is located at 141 N. Cleveland Park Drive in Spartanburg, SC. Cleveland Park is located in the City limits of Spartanburg. The Cleveland Park trail is an existing 6' wide asphalt trail and has a stone subgrade. The contractor is to remove the existing asphalt, preserve, compact, and/or level existing stone subgrade, and apply a new 2" asphalt top course. The cross slope on the trail is to be 2% or less slope to shed water. The Park Maintenance department will mark which sections of the trail will need to be removed and replaced.

Bid Results

Roads / Highways

$60,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
81
Bidding Soon
1,110
All Active Projects
487
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

February 1, 2022

img_map_placeholder

366 N Church St, Spartanburg, SC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.