BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a pipeline in Utica, Mississippi. Completed plans call for site work for a pipeline.

As of January 19, 2022, the project was awarded to Taylor Construction Inc. Bid amount received is $75,649.60 . The work to be done consists generally of 900 linear feet of 4 inch steel natural gas line and related items. Each Bidder shall have a Certificate of Responsibility to bid on contracts for public projects in which the bid price exceeds $50,000.00 and for private projects in which the bid price exceeds $100,000.00 as required by the laws of the State of Mississippi. Each Bidder shall show on the outside of the envelope containing his bid: his current certificate of responsibility number and expiration date or if applicable, a statement certifying that the bid enclosed does not exceed $50,000.00 for a public project or $100,000.00 for a private project. Failure to show these items on the outside of the envelope containing the bid will result in the bid being returned to Bidder unopened. No Bidder may withdraw his bid for a period of sixty (60) days after date of actual bid opening, without Owner's consent. The Town of Utica reserves the right to reject any or all proposals received, to waive any informalities in the bids received, and to accept any proposal which is deemed most favorable to the Town of Utica.

Award

Pipeline

$75,650.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
1
Bidding Soon
197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2022

February 3, 2022

Project location map

Multiple Locations, Utica, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.