BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a playground / park / athletic field in Malibu, California. Completed plans call for site work for a playground / park / athletic field.

The work for the Ramirez Canyon Park Irrigation project includes but is not limited to the testing and removal of existing irrigation materials, new installation of irrigation controllers, backflows, flow sensors, shutoffs, main lines, lateral lines, sleeving under paving, valves, valve boxes, sprinkler heads, risers, drippers, and drip emitters. Additional improvements shall include but are not limited to removal and replacement of hardscape for purposes of installing new irrigation sleeving, as approved by the owner. The contractor shall furnish all labor, materials, equipment, services, and incidental materials necessary for the irrigation work. All questions should be submitted via the email listed above to the Staff Landscape Architect by 5:00 p.m. on December 22, 2021. Any clarifications will be provided in writing by December 29, 2021. 1. Anticipated Notice of Intent to Award Bid: February 3, 2022. This date is subject to change without notice. 2. Anticipated Construction Start Date: February 14, 2022. This date is subject to change without notice. 3. Anticipated Contract Length: 60 working days. Work must be completed by May 6, 2022. Schedule of Work: Contractor shall utilize standard industry scheduling software or equivalent scheduling software to employ the Critical Path Method (CPM) in the development and maintenance of the construction schedule. Refer to General and Special Conditions for additional Schedule Submittal and Maintenance Requirements. 1) A labor and materials payment bond in an amount equal to one hundred percent (100%) of the contract price; 2) a faithful performance bond in an amount equal to one hundred percent (100%) of the contract price; and 3) upon project completion and acceptance by the MRCA, a one year warrantee bond in an amount equal to ten percent (10%) of the contract price.

Bid Results

Playgrounds / Parks / Athletic Fields

$334,000.00

Public - County

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
193
Bidding Soon
3,092
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 21, 2022

Project location map

5750 Ramirez Canyon Rd, Malibu, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.