Site work and new construction of a transportation facility in Vancouver, British Columbia. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

The Work of the Contract includes the upgrade of the station’s Transformer, Generator and 15kV cable. The new 25kV cable will run from the substation located at Porta park, to the East side of Waterfront Station. New concrete pads will need to be installed for the new Transformer and Generator, as well as the demo of the existing pads. It is Graham’s intention to generate a prequalified list of trade contractors to bid. The current invite is to submit prequalification documents for the listed scopes. Additional invitations will follow for other Tender Packages. Tender package scopes and descriptions below. Please note these are preliminary descriptions designed to help contractors decide on bidding, and scopes may change as the design is developed further. Concrete Supply Supply concrete for the two concrete pads, at the transformer and generator locations. Concrete Reinforcement Supply and install rebar for the two concrete pads, at the transformer and generator locations. Concrete Formwork, Placing & Finishing Install formwork, placing and finishing for the two concrete pads for the transformer and generator. Structural Steel & Miscellaneous Metals Steel grating and handrails to be installed around the transformer, misc. metal items for cable trays. Mechanical Small mechanical scope TBD, less than 10k. Fire Protection Fireproofing penetrations through concrete and steel stud walls. Estimated to be less than 20 penetrations. Traffic Control Preparing two traffic management plans, provide two nights of traffic control for concrete pours. Security 2 months of 24/7 security service needed. Remediation/Cleaning Cleaning 80 location inside concrete trench required to clean electrical pull pits. Other location in the station may need cleaning prior to working. Civil Due to proximity of the work to the trains and tracks, contractors will hand dig one 24” trenches for two conduits roughly 20’ long at the transformer location. Shorter trenches for the generator location will be also hand dug. If required, the contractor will may be asked to remove materials in non-revenue hours.

Post-Bid

Transportation Terminals

$250,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
60
Bidding Soon
2,061
All Active Projects
759
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 17, 2021

April 1, 2022

img_map_placeholder

from the substation located at Porta park, to the East side of Waterfront Station, Vancouver, BC