Published August 29, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a road / highway in Wichita Falls, Texas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Complete the estimated 25 mile Circle Trail by connecting the three gaps. Currently, approximately 23 miles are completed or nearing completion. The gaps are 1) between the Lucy Park and the Camp Fire Property, and 2) between Barnett Road and Lake Wichita Park. The latter trail may be partially constructed in Lake Wichita to increase trail interest/attractiveness and to avoid shoreline encroachments. Also, included are three Circle Trail spurs. These are 1) a two mile spur from the Holliday Creek trail along the BNSF RR ROW through downtown ending at the Wichita River trail @ $2m, 2) a five mile spur from the Wichita River trail by O'Reilly Park north along the BNSF RR ROW under Spur 325 and under I44 to trailhead at Missile Road @ $5m, and 3) a 1.5 mile spur, pending Corps of Engineers and MSU approval, from the Holliday Creek trail up the McGrath Creek concrete channel, under five street bridges, connecting with the MSU Sikes Lake trail, continuing through Wood Memorial Park and the Maplewood Drive median under two street bridge replacements, to end at Kemp Street @$6m. Total new trail length is approximately 8.5 miles, assuming approvals of the McGrath Creek spur. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of August 29, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$21,781,314.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2023
Multiple Locations, Wichita Falls, TX
Related To This Project
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Oct 29 2021
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Jan 09 2023
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Aug 02 2022
Wichita Falls, TX
Bid Date: Aug 02 2022
Wichita Falls, TX
Bid Date: Aug 15 2022
Wichita Falls, TX
Bid Date: Jan 09 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.