BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Chesterfield, Missouri. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Bidders shall comply with the requirements of the specifications and RSMo Section 290.220 which provides that "A wage of no less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, shall be paid to all workers employed by or on behalf of any public body engaged in public works exclusive of maintenance work." Bids may not be withdrawn for at least 45 days after the closing date for receipt of bids. All Bids must be fully completed Bids by a Prime Contractor who shall have responsibility for all portions of the Work. Individual Bids by separate Contractors for separate portions of the Work will not be accepted. A bid bond will be required in the amount of five percent (5%) of the amount of the contractor's bid. It Is Anticipated That the Successful Contractor Will Be Given Notice to Proceed on or Before February 16, 2022 With Substantial Completion to Occur on or Before June 10, 2022. Owner reserves the right to reject non-compliant products, whether installed or not, and require their removal and replacement with compliant products at no extra cost to Owner.

Post-Bid

Educational

$10,000.00

Public - County

Asbestos Abatement, Site Work

34

9

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
46
Bidding Soon
833
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2022

February 16, 2022

img_map_placeholder

170 Portico Ct, Chesterfield, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.