Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Clearwater, Florida. Completed plans call for the renovation of a transportation facility.
As of March 8, 2022, the project has been awarded to DS Jordan Construction, Inc. for $381,731.50. The intent of the project is to install a new freight service elevator in the terminal building at PIE. The new elevator will be utilized for the second-floor restaurant, vendor usage for deliveries and building maintenance purposes. The existing elevators are currently being shared with airport passengers and do now allow a separate means of transporting goods and materials to the second floor. Project Location: St. Pete-Clearwater International Airport (PIE) 14700 Terminal Blvd. Clearwater, Florid 33762 QA date---January 11, 2022 by 3:00 PM the addition of a new service elevator to serve restaurants / concessions and general airport staff. . remove existing personnel metal doors and associated elements at levels 1, 2 and 3. . remove existing slabs within the shaft. . enclose existing door opening in wall by adding concrete masonry blocks at roof level. . remove existing front wall of first and second floor and refill by adding concrete masonry blocks. . repair and paint adjacent walls to match existing finishes. . provide temporary construction partition / divider to separate ongoing construction work. If you have questions or seek further information, please contact either Pamela Ulrich at (727)464-3150 or Merry Celeste, Division Director of Purchasing and Risk Management at (727)464-3559 Budget $346,142.50 Completion- 180 consecutive calendar days
Award
Transportation Terminals
$381,732.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2022
April 13, 2022
14700 Terminal Blvd, Clearwater, FL
Related To This Project
Clearwater, FL
Bid Date: Jan 20 2022
Clearwater, FL
--
Clearwater, FL
--
Clearwater, FL
--
Clearwater, FL
--
Clearwater, FL
Bid Date: Aug 12 2021
Clearwater, FL
Bid Date: Jan 13 2022
Clearwater, FL
Bid Date: Mar 26 2019
Clearwater, FL
Bid Date: Feb 10 2022
Clearwater, FL
Bid Date: Dec 15 2021
Clearwater, FL
Bid Date: Mar 16 2022
Clearwater, FL
Bid Date: Mar 17 2022
Clearwater, FL
Bid Date: Mar 17 2022
Clearwater, FL
--
Clearwater, FL
Bid Date: Mar 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.