Demolition, site work and new construction of a fire / police facility in Northampton, Pennsylvania. Completed plans call civil work for a fire station.

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the follow: Demolition of the existing building(s) and associated site work. New building construction and associated site work. Coordination and protection of Cell Tower facilities at Station #3. Coordination and protection of Verizon facilities at Station #73. This project is bid Multi-Prime and Prevailing Wage. Please see Specification 007346.13 - Prevailing Wage Rate Determination Schedule. Addendum #1-#4 have been issued, as of 1-3-2022. General Construction Bid Form: Base Bid #A (Fire Station #3 ONLY): All work complete as shown in Contract Documents for Fire Station #3 ONLY. Please see Specification 004116 - General Construction Bid Form. Base Bid #B (Fire Station #73 ONLY): All work complete as shown in Contract Documents for Fire Station #73 ONLY. Please see Specification 004116 - General Construction Bid Form. Base Bid #C (Fire Stations #3 & #73 COMBINED): All work complete as shown in Contract Documents for Fire Stations #3 and #73 COMBINED. Please see Specification 004116 - General Construction Bid Form. Alternates: See specification 012300 - Alternates. Alternate No. 1A (Station #3): Earthwork Classification State the adjustment in price to be added to or deducted from the Base Bid should the Owner wish to change to earthwork excavations to unclassified for rock removal through hydraulic/mechanical means (no blasting permitted). Alternate No. 1B (Station #73): Earthwork Classification State the adjustment in price to be added to or deducted from the Base Bid should the Owner wish to change to earthwork excavations to unclassified for rock removal through hydraulic/mechanical means (no blasting permitted). Alternate No. 1C (Stations #3 & #73): Earthwork Classification State the adjustment in price to be added to or deducted from the Base Bid should the Owner wish to change to earthwork excavations to unclassified for rock removal through hydraulic/mechanical means (no blasting permitted). Alternate No. 3A (Station #3): Doors State the adjustment in price to be deducted from the Base Bid to remove the four-fold apparatus bay doors along the front of the building (7 doors) and provide roll up doors (7 doors) as designated on the Construction Documents. Alternate No. 3B (Station #73): Doors State the adjustment in price to be deducted from the Base Bid to remove the four-fold apparatus bay doors along the front of the building (4 doors) and provide roll up doors (4 doors) as designated on the Construction Documents. Alternate No. 3C (Stations #3 & #73): Doors State the adjustment in price to be deducted from the Base Bid to remove the four-fold apparatus bay doors along the front of the building (7 doors at Station #3 and 4 doors at Station #73) and provide roll up doors (7 doors at Station #3 and 4 doors at Station #73) as designated on the Construction Documents. Alternate No. 4A (Station #3): Resinous Flooring State the adjustment in price to be deducted from the Base Bid to provide Resinous Flooring Urethane Cement ALTERNATE [RES-FLR-2-ALT] at 3/16 inch thickness in lieu of Resinous Flooring Urethane Cement [RES-FLR-2] at 1/4 inch thickness as designated on the Construction Documents. Reference the Bid Documents for related finish abbreviations and products. Alternate No. 4B (Station #73): Resinous Flooring State the adjustment in price to be deducted from the Base Bid to provide Resinous Flooring Urethane Cement ALTERNATE [RES-FLR-2-ALT] at 3/16 inch thickness in lieu of Resinous Flooring Urethane Cement [RES-FLR-2] at 1/4 inch thickness as designated on the Construction Documents. Reference the Bid Documents for related finish abbreviations and products. Alternate No. 4C (Stations #3 & #73): Resinous Flooring State the adjustment in price to be deducted from the Base Bid to provide Resinous Flooring Urethane Cement ALTERNATE [RES-FLR-2-ALT] at 3/16 inch thickness in lieu of Resinous Flooring Urethane Cement [RES-FLR-2] at 1/4 inch thickness as designated on the Construction Documents. Alternate No. 7A (Station #3): Equipment The Base Bid equipment list has equipment supplied/installed by Owner, provided by Owner/Installed by General Contractor, and supplied by General Contractor/Installed by General Contractor. The alternate bid has the General Contractor supplying and installing ALL equipment. The Bidder shall state the adjustment in price to be added to or deducted from the Base Bid to provide and install ALL equipment from the Base Bid equipment list. Alternate No. 7B (Station #73): Equipment The Base Bid equipment list has equipment supplied/installed by Owner, provided by Owner/Installed by General Contractor, and supplied by General Contractor/Installed by General Contractor. The alternate bid has the General Contractor supplying and installing ALL equipment. The Bidder shall state the adjustment in price to be added to or deducted from the Base Bid to provide and install ALL equipment from the Base Bid equipment list. Alternate No. 7A (Stations #3 & #73): Equipment The Base Bid equipment list has equipment supplied/installed by Owner, provided by Owner/Installed by General Contractor, and supplied by General Contractor/Installed by General Contractor. The alternate bid has the General Contractor supplying and installing ALL equipment. The Bidder shall state the adjustment in price to be added to or deducted from the Base Bid to provide and install ALL equipment from the Base Bid equipment list. Unit Prices: See specification 012200 - Unit Prices and Specification 004116 - General Construction Bid Form.. Skepton Construction, Inc. Instructions: Please breakout your pricing by Base Bid (Station #3 and/or Station #73). We will need to know your pricing by Station in order to accurately quote the project. Please respond to the project invite as either Bidding or Not Bidding. We do not require you to submit your proposal through Building Connected though. In fact, we prefer it if you email your proposals to jim@skeptonconstruction.com.

Bid Results

Fire / Police

$1,200,000.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
626
Active Projects
371
Bidding Soon
4,337
All Active Projects
1,891
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 18, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Northampton, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.