Published February 21, 2022 at 7:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Kleinfelder Project No. 20211359.001A Construct a new off airport storage/operations facility for the Airport Authority shuttle bus fleets. The new facility will be located along the N/E side of Pacific Highway just north of the Laurel Street intersection.The Work includes, but is not limited to, the following:Demolition/removal of existing site improvements including asphalt pavements, entrance canopy and toll booths, fencing, utilities, landscaping and irrigation, light poles, and other miscellaneous features. Construction/installation of new earthwork, storm drainage pipes and water quality structures, wet and dry utilities and utility service connections, asphalt and concrete paving, retaining wall, vehicle barriers and bollards, curb and gutter, electric vehicle charging stations and related infrastructure, bioretention areas, curb and gutter, light poles, decorative/security fencing and vehicle access gates, landscaping and irrigation, pavement striping and marking, enabling infrastructure for temporary office trailers, and other miscellaneous features.Once the Work is substantially complete, the Airport Authority will begin installation of three (3) temporary office/break room/restroom trailers at the locations shown on the Drawings. The Contractor is not responsible for that work but shall cooperate and coordinate with the Airport Authority's modular building contractor as directed by the Representative. Deadline to submit questions: All questions must be submitted to Erica Lopez at: elopez@san.org no later than December 23, 2021 at 2:00 p.m.Online Q&A :No Bid Bond:10.00% Payment Bond:100.00% Performance Bond:100.00%

Award

Transportation Terminals

$6,363,363.00

Public - County

Paving, Site Work

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
113
Bidding Soon
1,379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2022

March 11, 2022

Project location map

W Laurel St & Pacific Hwy, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.