Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Hampton, Virginia. Completed plans call for the renovation of a clubhouse / community center.
Roof Replacement Senior Center Minority-Owned, Woman-Owned and Veteran Businesses are encouraged to participate. Minorities (MBE) 4.34% Non-minority women (WBE) 3.82% It is understood that, during the course of construction, changes in the Scope of Work may be necessary and will be executed as follows: A. Changes Requested By the Contractor. Changes in specified methods of construction or in the plans and specifications, which do not materially affect the Work, and which are not detrimental to the Work or to the interests of the City, may be granted by the Engineer if requested by the Contractor in writing. No additional payment or contract time will be made for these changes. B. Changes Requested by the City. The City may change the plans, specifications, character of the Work, or quantity of the Work, both additive and deductive. Changes affecting the Contract price shall be issued through a change order and shall be accepted by Contractor signature. C. The provisions of A and B above shall not limit or restrict Contractor's responsibility or authority for emergency work. D. A cost proposal for a change in the Work shall provide a complete breakdown itemizing the estimated quantities and costs of the change. The allowable percentage markups for overhead and profit for a change to the Work performed by Contractor's own forces or performed by the subcontractor shall be negotiated based on the nature, size, and complexity of the Work involved but shall not exceed the percentages for each category listed below: 1. Subcontractor's markup for overhead and profit for the Work it performs in a change to the Work shall be a maximum of fifteen percent (15%) of that subcontractor's Base Cost. 2. Contractor's markup for overhead and profit on a subcontractor's price for a change to the Work shall be a maximum of ten percent (10%). 3. Contractor's markup for overhead and profit (including bonds and insurance) for Work it performs in a change to the Work shall be a maximum of fifteen percent (15%) of the Base Cost. 4. The markup for overhead and profit of a sub-subcontractor at any tier on a change to the Work it performs shall be a maximum of fifteen percent (15%) of that sub- subcontractor's Base Cost. Contractor and all intervening tiers of subcontractors' markup on such sub-subcontractor's price under this subsection in the change to the Work shall not exceed a total often percent (10%). E. The allowable percentage markups for overhead and profit stated above shall compensate Contractor, subcontractor, and sub-subcontractor for all other costs associated with or relating to the change to the Work including by way of illustration and not limitation, general conditions, supervision, field engineering, coordination, insurance, bond(s), use of small tools, incidental job costs, and all other general and administrative home and field office expenses. Deadline for Questions - December 21, 2021, by 4:30 pm
Award
Clubhouse / Community Centers
$166,970.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2022
February 7, 2022
3501 Kecoughtan Rd, Hampton, VA
Related To This Project
Hampton, VA
Bid Date: Feb 01 2022
Hampton, VA
Bid Date: Jan 28 2022
Hampton, VA
Bid Date: Jan 18 2022
Hampton, VA
Bid Date: Jan 19 2022
Hampton, VA
Bid Date: Feb 03 2022
Hampton, VA
Bid Date: Feb 22 2022
Hampton, VA
Bid Date: Feb 17 2022
Hampton, VA
Bid Date: Sep 13 2023
Hampton, VA
--
Hampton, VA
Bid Date: Sep 13 2023
Hampton, VA
Bid Date: Sep 08 2023
Hampton, VA
Bid Date: Nov 06 2023
Hampton, VA
Bid Date: Sep 12 2023
Hampton, VA
Bid Date: Sep 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.