Demolition, site work and new construction of an educational facility in Tacoma, Washington. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Last day for RFQ/RFP questions and comments to be submitted by Proposers for response by addendum February 18, 2022 (2:00pm PST) Tacoma Public Schools (TPS or District) is soliciting Statements of Qualifications (SOQ) from qualified Design-Builders (which may include joint ventures) to provide design-build services for the design and construction of a replacement school on the existing site of the current Bryant Montessori K-8 School (BMS). The delivery method will be the progressive design-build (PD/B) contracting method. The Design-Builder will be tasked with a full range of programming, design services and deliverables to describe the project for purposes of negotiation of GMP, permit review, subcontractor bidding, construction, commissioning, performance guarantees and other aspects of scope and terms sufficient to complete the project as required for use and occupancy by the District. Questions Due Date: Jan 19th 2022, 2:00 PM PST Intent to Bid Due Date: Jan 24th 2022, 2:00 PM PST The estimated total budget for design and construction of this project is anticipated to be in the range of $31,500,000. The preliminary, combined design and construction budget (Owner's MACC) for the project is approximately $31,640,720, with a total project budget of approximately $47,940,480. As part of Tacoma School District's commitment to investing in the community, as documented in its 2016 Community Inclusion Commitment, contractors on District projects will be expected to implement an outreach plan to attempt to meet or exceed the District's utilization goals of ten percent (10%) certified minority-owned businesses, six percent (6%) certified women-owned busi-nesses, and five percent (5%) cer-tified small business enterprises and thirty percent (30%) local businesses on this project, based on the prime contractor's total contract dollar amount. The method of Contractor Selection has not been Determined at this time. Construction work required of the Design-Builder may include, but is not limited to, TESC; HazMat abatement; demolition of existing buildings and associated utilities and site improvements; new site utilities; grading and earthwork; onsite/offsite site improvements; stormwater facilities; paving, curbs and concrete flatwork; concrete foundations; building construction; M/E/P systems;specialty equipment; fire suppression systems; data system; fire alarm system; security alarmsystem; interior finishes and exterior finishes. Bryant Montessori K-8 School: The existing Bryant Montessori K-8 School (BMS) is located at 717 South Grant Avenue in central Tacoma on a 2.35-acre site. The current building area of BMS is approximately 38,787 sf exclusive of the covered play structure and portable classrooms. The Bryant Montessori K-8 School is a circa 1960 and consists of a two-story classroom wing and a single-story Administration and Multi-purpose wing. In 2000 a new covered play structure was constructed in the paved play area located west of the classroom wing. The existing school structure is located along the south and west edge of the property, fronting on South 8th Street and South Grant Avenue, with a small grass playfield on the north end of the site, a large, paved play area in the center of the site. Additionally, there are a number of portable classroom buildings situated to the north and west of the classroom wing and a small garden area is situated in the northwest corner of the site. The site is surrounded on all sides by dense residential properties. This project will involve demolition of the existing BMS facilities and construction of a new facility. Construction will include, but is not limited to, new building(s), utilities and infrastructure, onsite/off-site improvements, parking, playgrounds and play field. The new FES will be designed to house approximately 560 students in an approximately 60,000 sf plus facility Building Construction July 2023 between July 2024 Punchlist Completion and Closeout- September 13, 2024

Post-Bid

Educational

$31,640,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
78
Bidding Soon
2,005
All Active Projects
603
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 28, 2022

July 7, 2023

September 19, 2024

img_map_placeholder

717 S Grant Ave, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.