Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 8, 2022 at 8:00 PM
Updated September 15, 2023
Site work and renovation of a water / sewer project in Montville, Connecticut. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of February 23,2022, this project has been awarded to Tucker Mechanical, with the awarded amount of $811,999.20.** The Work involves air diffuser upgrades to Sequencing Batch Reactors (SBR) No. 1, 2, 3, 5 and 6 at the Montville Water Pollution Control Facility. The Work includes the replacement of air diffusers assemblies, distributors and installation of waste sludge pump guide rails. Engineer's Estimate: $1.3M A. Work Included: Montville, CT Water Pollution Control Facility SBR Air Diffuser Upgrades Phase 2. The major proposed work under this Contract includes replacement of the 4" PVC air distributors and associated diffuser assemblies in Sequencing Batch Reactor (SBR) Nos. 1, 2, 3, 5 and 6: 1. Removal and replacement of 4" PVC air distributors and associated diffuser assemblies. Each air diffuser assembly includes an EPDM air diffuser membrane, membrane support disc, diffuser element holder, membrane retaining device and airflow control device. 2. Installation of pump guide rail system for existing submersible waste sludge pump in each SBR 3. Pumping of liquid contents from each SBR tank prior to performing the work. 4. Removal and Disposal of materials off site including: a. Items from above b. Grit, Debris, Sludge removed from the SBR tanks identified after draining the tank and covered under the Unit Price bid Item 5. Maintain plant flow and treatment processes as detailed in Part 3 of this section. B. Related Work Specified Elsewhere: 1. Demolition and Grit/Debris Removal Section 02050A 2. Coordination Section 01050 3. Equipment Section 11000 4. Fine Bubble Aeration System 11378 C. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment.
Award
Water / Sewer
$811,999.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2022
March 28, 2022
To Be Determined, Montville, CT
Related To This Project
Montville, CT
Bid Date: Mar 13 2023
Montville, CT
Bid Date: May 02 2023
Montville, CT
Bid Date: May 16 2023
Montville, CT
--
Montville, CT
Bid Date: May 23 2023
Montville, CT
Bid Date: Jun 06 2023
Montville, CT
Bid Date: Jun 16 2023
Montville, CT
Bid Date: Jun 23 2023
Montville, CT
Bid Date: Aug 30 2022
Montville, CT
--
Montville, CT
Bid Date: Jun 29 2022
Montville, CT
Bid Date: Mar 24 2022
Montville, CT
Bid Date: Dec 06 2022
Montville, CT
Bid Date: Sep 27 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed