Site work for a water / sewer project in Royse City, Texas. Completed plans call for site work for a water / sewer project.

Major items include For Water Relocations: 3,099-LF 6" through 12" AWWA C-900 DR-18 water lines by open cut, 679 LF 8 through 12" AWWA C-900 DR-18 water lines with steel encasement by bore, 27 6" through 12" gate valves, 6 fire hydrants and 3,516-LF of pressure grouting and abandoning in place existing 8" through 12" water lines. For Sanitary Sewer Relocations: 4,117-LF 6" through 15" SDR 26 & SDR 35 PVC sanitary sewer lines by open cut, 370-LF 8" SDR 35 PVC sanitary sewer with steel encasement by bore, 25 4-ft and 5-ft diameter manholes, 3,367-LF of pressure grouting and abandoning in place existing 6" through 12" sanitary sewer lines, including all proposed water and sanitary sewer line connections. Proposals shall be accompanied by a cashier's or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price, payable without recourse to the City of Royse City, or a bid bond in the same amount from an approved surety company holding a permit from the State of Texas to act as surety, as a guarantee that the bidder will enter into a contract and execute performance bond and payment bond within ten (10) days after being notified of award of contract. The Owner intends to provide a notice of award of contract within sixty (60) days following the bid opening. Bids without required check or bid bond will be rejected. The successful bidder must furnish performance bond upon the form provided in the amount of 100% of the contract price; a material and labor payment bond upon the form provided in the amount of 100% of the contract price; and a maintenance bond in the amount of 50% of the contract amount for a period of two (2) years from an approved surety company holding a permit from the State of Texas to act as surety or other sureties acceptable to the City of Royse City. Should the bidder fail to produce evidence satisfactory to the Royse City on any of the foregoing points, the bidder may be disqualified, and the work awarded to the next responsible bidder so qualifying. The City of Royse City reserves the right to reject any or all bids and to waive any informality in the bids received. In case of ambiguity or lack of clearness in stating prices in the bids, the City reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable or unbalanced unit prices will be considered sufficient cause of rejection of bids.

Bid Results

Water / Sewer

$1,864,079.00

Public - City

Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
67
Bidding Soon
3,591
All Active Projects
1,252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2022

February 7, 2022

img_map_placeholder

Multiple Locations, Royse City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.