BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Jacksonville, Illinois. Completed plans call for the renovation of a educational facility.

The Illinois School for the Visually Impaired is seeking a vendor to remove and replace plumbing fixtures in several rooms in building 18 1) Remove and replace Plumbing fixtures, in the following rooms in building 18; o Room 005: Remove and replace damaged 10" section of drainpipe. o Basement South restrooms: Remove and replace fixtures on two sinks, and two toilets. o Basement North rest room: Remove and replace fixtures on one sink, and one toilet. o Kitchen area N Basement: Remove and replace kitchen sink fixture. o Room 101 Remove and replace kitchen sink fixture, and disposal. o Room 108 Remove and replace fixtures on four showers, four sinks, one bath\shower combination, three toilets. o Room 115 Remove and replace fixtures on one sink, one toilet, and one shower head. o Room 123: Remove and replace fixtures on four showers, four sinks, one bath\shower combination, three toilets. o Room 132: Remove and replace kitchen sink fixture, and disposal. o Room 119: Remove and replace fixtures on one sink, one toilet, and one shower head. o Room 201: Remove and replace kitchen sink fixture, and disposal. o Room 211: Remove and replace fixtures on four showers, four sinks, one bath\shower combination, three toilets. o Room South end: Remove and replace fixtures on four showers, four sinks, one bath\shower combination, three toilets. o Room 215: Remove and replace fixtures on one sink, one toilet, and one shower head. o Room 220 Remove and replace fixtures on one sink, one toilet, and one shower head. o Room 234: Remove and replace kitchen sink fixture, and disposal. 1) The Contractor will be responsible for following all proper procedures, and methods of removal and disposal of old fixtures. 2) The Contractor will verify that all work is compliant with the Americans with Disabilities Act (ADA). 3) All hot water fixtures will have scald guards that are compliant with local and state regulations. 4) The Contractor will verify that water flow to all fixtures meets all standards and regulations. 5) All material must meet current safety standards and requirements

Award

Educational

$64,235.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
34
Bidding Soon
616
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2022

February 2, 2022

img_map_placeholder

658 E State St, Jacksonville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.