Site work and paving for a mixed-use development in Santa Rosa Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

PROJECT: This project provides additional drainage capacity along San Juan Avenue. The existing roadway has two (2) sixty (60) inch x thirty-eight (38) inch elliptical concrete pipe (ECP) cross drains under San Juan Avenue. The work includes the removal of the two (2) existing 60" x 38" ECP's and replacement with a double six (6) foot x three (3) foot box culvert. This project will include other work associated with the construction of the drainage improvements such as maintenance of traffic, erosion control, clearing and grubbing, dewatering, regular excavation, embankment, flowable fill, prepared soil layer, type B stabilization, Optional Base Group 6, Asphaltic Concrete, Milling, type F curb and gutter, four inch and six inch sidewalk, closed flume inlets, aluminum pipe handrail installation, concrete endwall construction, temporary shoring, rip rap, sodding, and pavement markings. Maintenance of drainage flow through the temporary culverts will be a major component of the project while the new box culvert is constructed. Due to the presence of utilities, no sheet piling is allowed on the project, alternative means of shoring such as Porta Dams shall be utilized. During construction San Juan Avenue will have one lane of traffic open at all times. Last date to submit questions is January 26, 2022 no later than 12:00 Noon. All questions are to be directed in writing to the County Purchasing Agent. DIRECTING QUESTIONS TO ANY OTHER STAFF, PROJECT ENGINEER AND ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN BID BEING DISQUALIFIED. Questions received after such date and time will not be answered.

Award

Water / Sewer

$821,105.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
23
Bidding Soon
381
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

February 25, 2022

img_map_placeholder

San Juan Ave, Santa Rosa Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.