Site work and paving for a mixed-use development in San Antonio, Texas. Conceptual plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:https://www.sanantonio.gov/portals/0/files/budget/fy2025/Adopted-Budget.pdf This project provides funding for continuation of a multi-phase floodplain improvement project of Seeling Channel includes curbs, sidewalks and driveway approaches as needed. Project is included in City of San Antonio Fiscal Year 2025-2030 Page no 771 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/newsletter/2024/tgi-10-25-2024/texas-government-insider-10-25-2024.html San Antonio spending $24 million to improve roads, drainage across the city San Antonio will spend $24 million to enhance drainage infrastructure and reconstruct roads as part of its Hazard Mitigation Action Plan. All projects are currently in the design phase, and construction is expected to start in 2025. The city will spend $11.4 million to update stormwater drainage systems, improve channels and rework associated roadways for the Eisenhauer-Northwood-Devonshire Phase 1A. The roadway's existing conditions have a low water crossing, limited or nonexistent sidewalks and insufficient curbs. The improvements will address the road’s undersized storm system and channel, remove vegetation and replace concrete panels. The project will install sidewalks on each side of the road with associated curbs and gutters. Plans include installing storm drain inlets and raising the street above the low water crossing. The city will also replace utility lines as needed and reconstruct driveways impacted by roadwork. To improve stormwater drainage, the project will install a box culvert under the channel, plant a grass and artificial turf swale above it and build a connected maintenance ramp with gate. San Antonio will invest $8.2 million to improve the drainage system and reconstruct the roadway for Phase 4 of the Seeling Drainage project. The road currently suffers from extensive pavement fatigue, drainage problems and outdated pedestrian amenities. The project will install an underground storm drain system and upgrade utilities in the area. The city will reconstruct and resurface the street and build additional sidewalks on either side of the road with curbs. Plans also include making the street ADA-accessible with wheelchair ramps and rebuilding driveway approaches. $4.4 million will be allocated to improve channels, replace culverts and adjust roadways for the Brookside Outfall project. The current infrastructure can’t provide enough drainage for the local neighborhood, causing flooding issues and overtopping that affects residences. The project will install 23 box culverts across four locations in the area. The city will also install a 20-foot-, 30-foot- and 40-foot-wide channel at three separate streets. ------------------------------- https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025003295 Project Name: Seeling Drainage Phase IV Project Number: TABS2025003295 Facility Name: Seeling Drainage Projects Location Address: Seeling Blvd from St Cloud to Lowry Dr, & Placid D San Antonio, TX 78205 Location County: Bexar Start Date: 5/5/2025 Completion Date: 10/28/2027 Estimated Cost: $20,000,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Drainage & Roadway improvements along Seeling Blvd Square Footage: 328,000 ft 2 --------------------------------------------------------------------------------- A detailed scope has not been identified. This project is included in the city's fy 2024-2029 Capital Improvement Program. As of February 12, 2024, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,572,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
99
Bidding Soon
2,093
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.