BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Baltimore, Maryland. Completed plans call for the demolition of a educational facility; for the construction of a four-story above grade educational facility; for site work for a educational facility; road / highway; and for paving for a road / highway.

*As of May 31, 2023, a Construction Manager has been awarded. Project is currently still in design. Construction Management at Risk (CMAR) Science Center Phase I Demolition of the Washington Service Center (WSC) DCM-SCIC1-23-1CM AND Science Center Phase II New Construction DCM-SCIC2-23-1CM On the Campus of Morgan State University. LEED and Energy Sustainability / Efficiency: The Campus has been and continues to strive for energy efficiency, carbon neutrality, and sustainability regardless of a LEED designation. We have 3 LEED Gold and 1 LEED Silver building (plus two pending Silvers). The goal is to strive for Gold, a minimum of Silver. The demolition and new construction projects are anticipated to contribute to the LEED certification of the new Science Center. All preliminary documentation of the demolition materials is to be accounted for so they may apply to the LEED certification of the new construction. Achieving energy efficiency should remain cost-effective. First and second costs studies should be done on proposed systems to determine the best systems for the project. The Washington Service Center ("WSC") is located at the southwest corner of East Cold Spring Lane and Stadium Way. The WSC includes: 1. The 4-story masonry building and the Annex/trailers, 2. Two 25,000-gallon emergency oil tanks for the University's heating plant; and 3. Four other fuel tanks are used to fuel state vehicles and ground equipment. 4. Repairs to Stadium Way and to the roadway to Lot L/M Rock is likely to present on this site and may impact the design and construction as there are many rock out-cropping along Cold Spring Lane, and rock has been experienced at other project construction sights. The Science Center project consists of two phases which will be designed concurrently, but two separate construction phases where the new construction will succeed in the Demolition of the Washington Service Center, relocation of oil tanks, and the South Campus work. The demolition and new construction phases must be considered two separate projects as they will be funded separately. However, the projects must be tightly coordinated between demo and new so the site is not left vacant for too long. Due to current market conditions, procurement of scopes for Phase 2: New Construction may occur during the demolition phase, and work may become overlapping. MBE Participation (%) 40.0 The sub-goals are: 8% African American owned businesses. 2% Hispanic owned businesses. 11% Women owned businesses. Expression of Interest January 16, 2023 COB Last Day of Questions January 23, 2023 12:00 noon Responses to Questions Published January 27, 2023 COB Technical Proposals Due February 3, 2023 2:00 p.m. Short List-Notification to Firms TBD COB Orals March 1st - 3rd 2023 TBD Short List-Notification to Firms March 6, 2023 TBD Fee Proposals Due March 14, 2023 2:00 p.m. BAFO (Where applicable) March 24, 2023 2:00 p.m. Board of Public Works April 19, 2023 10:00 a.m. Initiation Meeting April 20, 2023 10:00 a.m. NTP Issued April 20, 2023 Initiation Meeting 4/20/23 Design (Program Verification, Site Planning, Concepts, SD, DD, CD, Estimating) 5/2/2022-4/30/2023 Bidding 2/1/2023-7/31/2023 Demolition 8/1/2023-7/30/2024 Substantial Completion 7/30/2024 BPW Approval 4/19/23 Kick Off Meeting 4/20/23 Program Verification/ Site Planning/ Concepts/Estimating 7/11/2022-12/16/2022 Schematic Design /Estimating 1/2023-5/2023 Design Development/Estimating 6/2023-12/2023 Construction Documents/Estimating 1/2024-7/2024 Bidding 4/2024-10/2024 Construction 7/2024-12/2026 Substantial Completion w/ Equipment installed by CM 2/28/2027 FF&E/Department Move-in 3/2027-7/2027 Building Formally Opens to Campus August 2027 Liquidated Damages are $6,000 per calendar day from any Milestone Date(s) and Substantial Completion Date not met per the above Project Schedule. All activities required and incidental to the performance and completion of the Work whether specified or implied in the Solicitation Documents including but not limited to all contract documents, labor, material, equipment, supervision, administration, general conditions, supplementary and special conditions, safety protections, hazardous material removal and disposal, public security protections, fugitive dust control, erosion controls, noise abatement, shift work, existing utility protections, right of way restoration, and impacted public right of way traffic management and controls

Award

Educational

$15,000,000.00

Public - State/Provincial

Demolition, LEED Certification, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
110
Bidding Soon
2,180
All Active Projects
794
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

September 8, 2023

img_map_placeholder

1700 E Cold Spring Ln, Baltimore, MD

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.