Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 26, 2022 at 7:00 PM
Updated October 1, 2024
Site work for a bridge / tunnel in Pearl River, Louisiana. Completed plans call for site work for a bridge / tunnel.
It is the intent and purpose of these specifications to secure for ST. Tammany Parish the necessary equipment and accessories, which will comprise a multi-conductor type color sewer TV inspection system. A detailed list of components required is included and is the basis on which the Contractors proposal is made. The following specification is based the Modular 1 Pipeline Inspection System. This specification is not to be interpreted as restrictive, but rather as a measure of the safety, quality and performance against which all inspection systems bid will be compared. Contractor shall conduct the Work in such a professional manner and with sufficient materials, equipment and labor as is considered necessary to ensure its completion within the time limit specified. The Owner shall issue a Notice to Proceed to the Contractor within twenty (20) calendar days from the date of execution of the Contract. Upon mutual consent by both parties, the Notice to Proceed may be extended. The Contractor is to commence Work under the Contract within ten (10) calendar days from the date the Notice to Proceed is issued by the Owner. The Contractor, immediately after being awarded the Contract, shall prepare and submit for the Owner's approval an estimated progress schedule for the work to be performed, as well as a construction signing layout for all roads within the project area. The Contractor shall not start work or request partial payment until the work schedule has been submitted to the Owner for approval. Revisions to the original schedule will be made based on extension of days granted for inclement weather or change orders issued under the contract. No other revision shall be made which affects the original completion or updated completion date, whichever is applicable. Failure of the Contractor to submit an estimated progress schedule or to complete timely and on schedule the Work shown on the progress schedule negates any and all causes or claims by the Contractor for accelerated completion damages. These accelerated damage claims shall be deemed forfeited. Meetings will be held as often as necessary to expedite the progress of the job. Meetings will be held during normal working hours at the jobsite and shall be mandatory for the Contractor and all Sub-Contractors working on the project. Meetings may be requested by the Owner at any time and at the discretion of the Owner.
Bid Results
Bridges / Tunnels
$94,465.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 28, 2021
January 27, 2022
63119 LA-1090, Pearl River, LA
Related To This Project
Pearl River, LA
Bid Date: Jan 11 2022
Pearl River, LA
Bid Date: May 06 2022
Pearl River, LA
Bid Date: Sep 28 2023
Pearl River, LA
Bid Date: Oct 04 2023
Pearl River, LA
Bid Date: Oct 31 2023
Pearl River, LA
Bid Date: Nov 30 2023
Pearl River, LA
Bid Date: Nov 29 2023
Pearl River, LA
Bid Date: Mar 05 2024
Pearl River, LA
--
Pearl River, LA
Bid Date: Jun 28 2023
Pearl River, LA
Bid Date: Jun 28 2023
Pearl River, LA
Bid Date: May 24 2023
Pearl River, LA
Bid Date: May 24 2023
Pearl River, LA
Bid Date: Dec 04 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.