BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Verona, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

2020-116, CTH M/CTH PB Intersection Expansion Project City of Verona, Wisconsin The major work consists of the following items: Approximately 3,100 square yards of removing asphaltic surface, 3,800 square yards of removing asphaltic surface milling, 5,150 cubic yards of common excavation, 500 cubic yards of borrow, 7,100 tons of base aggregate dense, 8 stations of shaping shoulders, 490 square yards of Concrete Pavement 9-Inch, 90 square yards of concrete truck apron 12-inch, 30 cubic yards of coloring concrete WisDOT red, 1,250 tons of HMA pavement 3 MT 58 28 S, 1,450 tons of HMA pavement 4 MT 58-28 S, 1,585 linear feet of concrete curb and gutter, 1,280 square feet of concrete sidewalk 5-inch, 4,100 linear feet of sawing pavement, 11,755 linear feet of marking line epoxy, 40 linear feet of culvert extensions, 16 linear feet of hydrant lead, 1 relocated hydrant, temporary traffic signals at the intersection of CTH M & CTH PB, traffic signals at the intersection of CTH PB & USH 18/151 eastbound ramps, traffic signals at the intersection of CTH M & CTH PB, and all appurtenant work.

Bid Results

Roads / Highways

$1,172,114.00

Public - City

Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
118
Bidding Soon
1,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

April 25, 2022

Project location map

County Highway Pb & County Hwy M, Verona, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.