BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; bridge / tunnel; bridge / tunnel; road / highway; and water / sewer project.

Counties: Duval Road Name: Sr 5 (Us 17/main St) Limits : Over the Broward River Bridge Project(s): 43744115201(*) Federal Aid No: D218132B Project(s): 43744115601 Federal Aid No: D218132B Total Roadway Length: 0.416 Miles Contract Days: 550 Total Bridge Length: 0.038 Miles Total Proposal Length: 0.454 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Calendar Days JEA Standards. Table A -- Schedule of Values is required to be submitted with the bid, as per Technical Special Provision T1000- 17. Please upload completed Table A as a zip file within your EBS File using the "File Attachment Upload" tab before submitting your bid. Railroad insurance is required for this Proposal at time of contract execution. Please see the Specifications Package for more information. The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, highway signing, guardrail, bridges, sidewalks, ground improvements, water main and other incidental construction on SR 5 (US 17/Main St.). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 Bridge Replacement/Milling and Resurfacing/Soil Stabilization Improvement/By Column Supported Embankment

Award

Bridges / Tunnels

$14,032,373.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
37
Bidding Soon
641
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 8, 2022

img_map_placeholder

FL-5, Jacksonville, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.