Site work and paving for a road / highway in Jurupa Valley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Estimated Bid Value $900,000 - $1,000,000. All work shall be performed in accordance with the Bid Documents (including, but not limited to the Special Provisions, and Plans), the Standard Plans, the Standard Specifications, Reference Specifications, and other Contract documents on file with the City of Jurupa Valley, California. 2. TIME OF COMPLETION All work must be completed within Forty (40) working days after the date of authorization specified in the Notice to Proceed and to diligently prosecute said work, including corrective items of work, day to day thereafter, except as adjusted by subsequent Contract Change Orders. 3. OBTAINING BIDDING DOCUMENTS The City of Jurupa Valley contracts with PlanetBids, Inc. to administer its Online Bidding System. PlanetBids requires potential vendors and bidders to register and log-in to its website in order to download contract and bid proposal documents, thereby assuring a means of notifying vendors and bidders are identified as "Planholders" of all subsequent information and addenda issued by the City. You will find the link to PlanetBids directly on the City's website. No Proposal will be accepted unless it is made on the Bidder's Proposal forms furnished by the City Each Proposal shall be accompanied by cash or a certified check or cashier's check or Bidder's Bond in the amount of ten percent (10%) of the total bid price payable to the City of Jurupa Valley as a guarantee that the Bidder, if his or her Proposal is accepted, will execute the Agreement, secure and furnish proof of Workers' Compensation Insurance, furnish any other insurance certificates as required, and furnish a Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, Labor and Materials Bond in the amount of one hundred percent (100%) of the total bid price (See Civil Code 9550), within fourteen (14) calendar days after the date of the receipt of the Agreement. Failure to execute and furnish said documents, within said 14 days, shall be just cause for the annulment of the award and forfeiture of the Proposal guarantee pursuant to the provisions of Section 20172 of the California Public Contract Code. The City will retain the Proposal guarantee of the first, second, and third lowest responsible Bidders until such time as the Agreement is executed. The Proposal guarantees submitted by all other Bidders will be released within thirty (30) days after the date of the Award of Contract. 5. STATE LICENSE No Bid will be accepted from a Bidder who is not fully and properly licensed as a Contractor for the work to be done under the Contract in accordance with the Provisions of Chapter 9 of Division 3, Commencing with Section 7000 of the Business and Professions Code of the State of California, at the time the Bidder submits the Bid. (B&P 7028.15) The prime Contractor shall have a Class "A" Contractor's license or a combination of Specialty Class "C" licenses sufficient to cover all of the work to be performed by the prime Contractor. All subcontractors shall be properly licensed. 6. OWNER'S RIGHT RESERVED Within such limits as may be prescribed by law, the City Council of the City of Jurupa Valley reserves the right to reject any and all Bids, to accept, reject or waive a minor variance in a Bid, to waive any informality in a Bid or accept the Bid or Bids that best serve the interests of the City. 7. WORK PERFORMED BY CONTRACTOR The successful Bidder shall perform, with its own organization, Contract work amounting to at least 50 percent (50%) of the Contract price. except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" may be deducted from the Contract price before computing the amount of work required to be performed by the Contractor. 8. FEDERAL FUNDING This project is being financed with Community Development Block Grant funds from the U.S. Department of Housing and Urban Development (24 CFR Part 570) and subject to certain requirements including: compliance with Section 3 (24 CFR Part 135) Economic Opportunities requirements; payment of Federal Davis-Bacon prevailing wages, as applicable; Federal Labor Standards Provisions (HUD 4010); Executive Order 11246; and others as described in Appendix E below. 9. WAGE RATES The Contractor shall comply with the Davis-Bacon Fair Labor Standards Act (40 USC a-276, a-5) and the implementation regulations thereof. Contractor shall comply with the U.S. Department of Housing and Urban Development's Federal Labor Standards Provisions (HUD 4010), incorporated as Exhibit B-1 in Appendix E. The Contractor cknowledges that work under this contract is subject to the payment of prevailing wages pursuant to Section 1770 and 1773 et seq. of the Labor Code of the State of California, the Director of Industrial Relations (State Prevailing Wages), and the U.S. Department of Housing and Urban Development's Federal Labor Standards Provisions (Davis-Bacon Act Prevailing Wages). The Contractor to whom the contract is awarded, and all subcontractors under him, shall pay the higher of the Federal or State prevailing wage rate for any given classification employed in the performance of this contract. The Federal wage decision is the one in effect ten (10) days prior to bid opening; it is available online. Addenda to modify the minimum wage rates, if necessary, will be issued to holders of the Project Bid Documents. The Contractor shall post a copy of said rates at the job site throughout the period of work on this project. The Contractor shall see that all employees of both the prime Contractor and subcontractors are being paid rates equal to or greater than the said rates. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1 (a)). The City reminds all contractors and subcontractors of the adoption of Senate Bill 854 and encourages all contractors and subcontractors to ensure that they are familiar with and comply with the recently enacted requirements. Such requirements include, but are not limited to, the requirement that contractors and subcontractors register with the Department of Industrial Relations, State of California (DIR), pursuant to Labor Code Section 1725.5, beginning July 1, 2014. In compliance with SB 854, the City require contractors and subcontractors to be registered with the DIR prior to submitting a bid on any public works project. Bids from contractors or subcontractors that are not currently registered as required will be deemed nonresponsive, and no contractor or subcontractor will be allowed to work on a City project unless they are registered with the DIR pursuant to Labor Code Section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The contractors and subcontractors must furnish electronic certified payroll records to the Labor Commissioner. 10. PAYMENT RETENTION OPTION Pursuant to California Public Contract Code Section 22300, the Contractor will be permitted the substitution of securities for any monies withheld by the City of Jurupa Valley to ensure performance under Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City of Jurupa Valley, or with the state or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor after satisfactory completion of the Contract. Securities eligible for investment under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, and standby letters of credit. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any dividends and interest thereon. 11. TECHNICAL INFORMATION For technical information relating to the details of the proposed project and bidding requirements, please submit a question directly. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Location - 50th St - Etiwanda Ave to Bain St 48th St - Martin St to Bain St Martin St - 50th St to Bellegrave Ave Troth St - 50th St to Bellegrave Ave Marlatt St - 50th St to Bellegrave Ave Dodd St - 50th St to Bellegrave Ave The rehabilitation of AC pavement by primarily, but not limited to, the grind and overlay or removal and replacement of existing AC pavement and AC dike on the streets and limits listed in the City of Jurupa Valley
Award
Roads / Highways
$810,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2021
February 23, 2022
Multiple Locations, Jurupa Valley, CA
Related To This Project
Jurupa Valley, CA
Bid Date: Feb 03 2021
Jurupa Valley, CA
Bid Date: Apr 27 2020
Jurupa Valley, CA
Bid Date: Apr 14 2021
Jurupa Valley, CA
Bid Date: Feb 17 2021
Jurupa Valley, CA
Bid Date: Jan 27 2021
Jurupa Valley, CA
Bid Date: Sep 14 2020
Jurupa Valley, CA
Bid Date: Apr 21 2022
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Apr 20 2022
Jurupa Valley, CA
Bid Date: Oct 18 2023
Jurupa Valley, CA
Bid Date: Dec 06 2022
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Sep 27 2022
Jurupa Valley, CA
Bid Date: Mar 03 2022
Jurupa Valley, CA
Bid Date: Nov 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.