Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Fulshear, Texas. Conceptual plans call for the construction of a water / sewer project.
This project consists of the construction of a new 1.0 MGD WWTP at the Cross Creek Ranch (CCR) Wastewater Treatment Plant (WWTP) site. This project will be expandable to 2.0 MGD. This 2.0 MGD plant will be a City of Fulshear facility, separately constructed adjacent to the CCR WWTP, a 2.0 MGD plant. The two plants will outfall effluent to the same polishing pond. The two plants will operate independently of each other. The projected wastewater flows in the City is projected to exceed the Downtown WWTP's expanded 1.1 MGD capacity. This project will be required to treat excess flows in the City's system. Increased capacity for new growth and development necessitate this project. As of December 09, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$16,250,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
7903 1/2 W Cross Creek Bend Ln, Fulshear, TX
Related To This Project
Fulshear, TX
--
Fulshear, TX
--
Fulshear, TX
Bid Date: Apr 06 2022
Fulshear, TX
Bid Date: Apr 29 2022
Fulshear, TX
Bid Date: May 11 2022
Fulshear, TX
--
Fulshear, TX
--
Fulshear, TX
Bid Date: Dec 16 2022
Fulshear, TX
Bid Date: Dec 07 2022
Fulshear, TX
Bid Date: Dec 07 2022
Fulshear, TX
--
Fulshear, TX
--
Fulshear, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.