BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and renovation of a mixed-use development in Haltom City, Texas. Completed plans call for the renovation of a stadium; for site work for a stadium; educational facility; and educational facility.

As of October 12, 2022, the project has not been awarded as it is currently on hold. The owner is considering separating the projects into multiple packages and placing the project out for rebid, however, that is yet to be determined. Question Deadline 1/6/2022 3:00 PM (CT). The contract documents and the complete scope of work for the project are illustrated on the combined Architectural, Structural, Plumbing, Heating, Ventilating, Air Conditioning and Electrical, and each Bidder shall thoroughly acquaint himself with all the details of the complete set of drawings and specifications before submitting his bid. All drawings and specifications form a part of the contract documents for each separate contract and shall be considered as bound therewith in the event partial sets of plans and specifications are issued for bidding only. The submission of bids shall be deemed evidence of the review and examination of all drawings, specifications, and addenda issued for this project as no allowances will be made because of unfamiliarity with any portion of the complete set of documents RFCSPs shall be accompanied by either an original cashier's check, certified check, or money order upon a state bank in the amount not less than five percent (5%) of the total maximum RFCSP price payable without recourse to the Birdville ISD, or an original bid bond in the same amount from a reliable surety company licensed to do business in the State of Texas. Bid Security serves as a guarantee that the Proposer will enter into a contract and execute a payment and performance bond on any or all projects $25,000 or above within fifteen (15) days after notice of award For projects in excess of $25,000, an original payment bond will be required of the successful Proposer and shall be executed by a surety company acceptable to the District and authorized to do business in Texas. The payment bond shall be in an amount equal to one hundred percent (100%) of the total sum for all projects in excess of $25,000.Original bonds shall be delivered to the District no later than fifteen (15) days after receiving the notice of award. For projects in excess of $100,000, BOTH an original performance bond and an original payment bond will be required of the successful Proposer and shall be executed by a surety company acceptable to the District and authorized to do business in the State of Texas. The performance and payment bond shall be in an amount equal to one hundred percent (100%) of the total sum for all projects in excess of $100,000. Failure to deliver the performance bond and payment as specified shall be considered as having abandoned the contract and the bid bond will be retained by the District as liquidated damages. Original bonds shall be delivered to the District no later than fifteen (15) days after receiving the notice of award. Liquidated Damages : Contractor and Owner recognize that time is of the essence as stated in Paragraph 1.04 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones Page 2 of 3 not achieved within the times specified in Paragraph 1.04 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay All questions must be submitted through the IonWave Bid System and received on or before January 6, 2022. No verbal responses will be provided. Please note that RFCSP results are NOT available by telephone. Awards will be posted to the district website Shelley Freeman Director of Purchasing 817-547-5629 shelley.freeman@birdvilleschools.net Deadline for Questions and Clarifications January 6, 2022 @ 3PM The Work will be substantially completed on or before August 1, 2022, and completed and ready for final payment on or before November 30, 2022

Post-Bid

Educational

$1,445,000.00

Public - County

Renovation, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
77
Bidding Soon
3,543
All Active Projects
1,295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

February 20, 2023

img_map_placeholder

Multiple Locations, Haltom City, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.