Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 19, 2022 at 7:00 PM
Updated January 27, 2024
Site work and paving for a road / highway in Thompson, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.
County: Grand This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This Is a Working P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater Than $6m but Less Than or Equal to $10m Mandatory Prequalification Required (Qualified Health Insurance Required) Project Location: US-191; SR-279 to Seven Mile Wash The principal items of work are as follows (for all items of work see attachment): SMA - 1/2 inch FSR-HMA-1/2 Inch In-Place Cold Recycled Asphaltic Base With Solventless Emulsion The project is to be completed: to be determined by competitive bid Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UTOT - US-191; SR-279 to Seven Mile Wash Rehabilitation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract time begins on first day of work or June 1st, 2022 whichever occurs first. 1. All work to be completed by the end of the 2022 Calendar year. 2. Do not start work prior to May 15 th, 2022.
Award
Roads / Highways
$8,288,345.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2022
June 1, 2022
US-191, Thompson, UT
Related To This Project
Thompson, UT
Bid Date: Mar 08 2022
Thompson, UT
Bid Date: Sep 30 2025
Thompson, UT
Bid Date: Feb 09 2023
Thompson, UT
Bid Date: Aug 17 2022
Thompson, UT
Bid Date: Jul 06 2022
Thompson, UT
Bid Date: Jan 12 2023
Thompson, UT
Bid Date: Oct 21 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
