BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a fire / police facility in Newmarket, Ontario. Conceptual plans call for the renovation of a fire / police facility.

Cafeteria Fit Up. Full demolition and fit-up of the cafeteria space which will result in the highest degree of functionality and flexibility in the cafeteria areas. TIMELINE: RFP for design was not awarded due to bids being non-compliant. Future of this project is unknown at this time. Coverage has been discontinued.

Project Abandoned

Fire / Police

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
178
Bidding Soon
4,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

Project location map

345 Harry Walker Pkwy S, Newmarket, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.