BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated January 18, 2025

Site work and new construction of a data center facility in Spanish Fork, Utah. Completed plans call for the construction of a data center facility; and for site work for a data center facility.

RFP Construction Manager - CM/CG for Spanish Fork Community Network (SFCN) Building Q & A deadline: Jan 12, 2022 7:00:00 PM EST The new SFCN Building will be located at the corner of 630 West Center Street. This site is undeveloped property next to the Justice Center.. Some of the property will need to be over excavated. The building is projected to be an administration building approximately 16,000 GSF and an attached shop building approximately 10,500 GSF with an additional storage mezzanine. The Administration component will provide office space for the SFCN customer service, IT and technicians. new parking and an access road to 630 west will be part of this project. Spanish Fork City anticipates using a CM/GC delivery method for this Project and expects to select the CM/GC at the completion of Schematic Design. Blalock and Partners has been retained as the project architect and has been tasked to assist the City in the selection of a CM/GC. It is anticipated that the CM/GC will provide multiple detailed construction estimates during the design phase, (1) at Schematic Design, (1) at Design Development, & (2-3) during Construction Documents leading to a Guaranteed Maximum Price (GMP) (refer to the Anticipated Schedule). For the purposes of preparing Proposal documents, the City expects/anticipates that coordination meetings could be held weekly, biweekly or even monthly, depending on timing for different phases of the work. During the Design Phase, CM/GC firms should expect 10-12 meetings with the City and the Architect. Additionally, the CM/GC may be expected to participate in 5-6 additional coordination meetings with the Architect and the Architect's Consulting Engineers, as required, for a complete project understanding. These meetings will be in addition to all construction meetings, phone calls and email coordination as needed.

Award

Data Centers

$875,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
66
Bidding Soon
885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

June 27, 2022

Project location map

65 S 630 W St, Spanish Fork, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.