BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a transportation facility in Minneapolis, Minnesota. Completed plans call for site work for a transportation facility.

Railroad, Electrical Installation/Construction, Construction, Electrical and Controls. The work of this project includes replacement of select special trackwork components, conversion of all six switch heaters within interchange interlocking from DC to AC power including all wiring and Xcel energy support work. The conversion of DC switch heaters to AC power is to eliminate stray DC current corrosion of track components. The entire LRT system is transitioning to AC powered switch heaters to eliminate stray current corrosion. Worn trackwork components will be replaced in advance of SWLRT opening. The Interchange interlocking sees over 400 train movements each day and is necessary for the smooth operation of the LRT system. The MCUB participation goal for this contract is 5%. Question Deadline: 1/19/22

Award

Transportation Terminals

$2,425,700.00

Public - State/Provincial

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
141
Bidding Soon
1,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 11, 2022

Project location map

To Be Determined, Minneapolis, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.