BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a playground / park / athletic field in Lebanon, New Hampshire. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

This Contract includes: fine grading of the new track, triple/long jump runways, and pole vault landing pad prior to paving, base and wearing course paving of the new track, triple/long jump runways and pole vault landing pad, reconstruction of triple/long jump sand pits and four takeoff boards for each runway, reconstructing shot put circle, removal of existing surfacing on high jump/pole vault area, surfacing of new track surfaces with either Plexitrac Accelerator Track Surface, or Beynon BSS-100 Polyurethane Track Surface (to be chosen by SAU #88) , and line markings in accordance with NFHS standards. This Contract is being completed separate from Contract 1 (Sitework) that includes all other earthwork required for reconstruction of the track in accordance with the Drawings. Under Contract 1 the contractor will be responsible for bringing select materials to proper grade and rough grading the track, triple and long jump area, and pole vault landing area, in preparation for Contract 2. Even though the site work is under a separate Contract, the Contractor must communicate all work with the parties involved with Contract 1 (Sitework) in order to make sure there is no conflict in schedule or the work. Contract 2 Paving and Surfacing of the Track shall be scheduled to begin on August 15, 2022 with completion by September 10, 2022. SAU is willing to discuss flexibility of the surfacing and striping to be completed by October 1, 2022 if colder weather does not impact application per the manufacturer standards. Contract 1 Work by others is expected to begin on May 30, 2022 with Contract Substantial Completion on or before September 1, 2022. Contract 1 must have all work internal to the field fence except for sod installation and seeding completed by August 15. The date of Final Completion for Contract 1 is on or before September 10, 2022

Award

Playgrounds / Parks / Athletic Fields

$443,244.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
124
Bidding Soon
1,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

August 15, 2022

Project location map

195 Hanover St, Lebanon, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.