Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 11, 2022 at 7:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Allen, Texas. Completed plans call for site work for a water / sewer project.
As of February 11, 2022, the project should be awarded later this month. This project includes construction of approximately 820 linear feet of 48" sewer line, 155 linear feet of 48" sewer line by bore with 66" steel casing, 7,881 linear feet of 54" sewer line, 2,228 linear feet of 66" sewer line, 460 linear feet of 66" sewer line with 84" steel casing installed by open cut, tee base manholes, connections to existing sewer lines, erosion and sedimentation control, dewatering, and associated site restoration and improvements. The project also includes installation of 11,765 linear feet of 4" PVC conduit, 1.66" HDPE innerduct, and fiber optic cable. Lastly, the project also includes the installation of approximately 7,140 linear feet of 5-strand barbed wire fencing. substantially complete and ready for operation within 480 consecutive calendar days, Final Completion of the project shall be achieved within 60 days of the Substantial Completion date. All questions must be submitted in writing, posted to electronically, by end of day Monday, January 10, 2022 Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the District "OWNER" within fifteen (15) days of Notice of Award of the contract. The security must be payable to North Texas Municipal Water District "OWNER" in the amount of five (5%) percent of the bid submitted. CONTRACTOR must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. CONTRACTORS for this Project must pay no less than the prevailing wage rates for the area established by the District "OWNER" and included in the contract documents. Performance and Payment Bonds are required, each in an amount of not less than one-hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials. The North Texas Municipal Water District "OWNER" reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all bids, and/or waive formalities. Bids may not be withdrawn within sixty (60) days from date on which bids are opened.
Bid Results
Water / Sewer
$10,084,532.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 18, 2022
March 21, 2022
Multiple Locations, Allen, TX
Related To This Project
Allen, TX
Bid Date: Jun 07 2022
Allen, TX
--
Allen, TX
--
Allen, TX
Bid Date: Apr 21 2022
Allen, TX
Bid Date: Apr 21 2022
Allen, TX
Bid Date: Mar 17 2022
Allen, TX
Bid Date: May 19 2022
Allen, TX
Bid Date: Jun 22 2022
Allen, TX
Bid Date: Apr 14 2022
Allen, TX
Bid Date: Jun 02 2022
Allen, TX
Bid Date: Apr 14 2022
Allen, TX
--
Allen, TX
Bid Date: Jan 05 2022
Allen, TX
Bid Date: Sep 09 2021
Allen, TX
Bid Date: Jan 19 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.