BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Napoleon, North Dakota. Completed plans call for site work for a water / sewer project.

The project includes the following work: sanitary sewer, storm sewer, and water installation, street reconstruction, and concrete work. Bids will be received for a single prime Contract. Each bid must be accompanied by a bidder's bond in a sum equal to 5% of the full amount of the bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and a contract is awarded to the principal, the principal, within ten (10) days after the notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond, and any conditions of the City of Napoleon, as required by law. A countersignature of a bid bond is not required. If the City of Napoleon elects to award a contract to the lowest responsible bidder, and the lowest responsible bidder does not execute a contract within ten (10) days, the bidder's bond will be forfeited to the City of Napoleon, and the City of Napoleon may award the project to the next lowest responsible bidder. Each bidder must possess a valid North Dakota contractor's license for the full amount of their bid, as required by N.D.C.C. 43- 07-7. Each bidder MUST enclose a copy of their Contractors License or Certificate of Renewal, issued by the North Dakota Secretary of State, and each license must be valid and dated at least 10 days prior to the date set for bid opening, as required under N.D.C.C. and 43-07-12. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials

Bid Results

Water / Sewer

$3,550,848.00

Public - City

Site Work

99

36

25

7

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
60
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

March 21, 2022

img_map_placeholder

Multiple Locations, Napoleon, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.