Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2022 at 7:00 PM
Updated November 15, 2023
Site work and renovation of a detention facility in Middleton, Massachusetts. Completed plans call for the renovation of a detention facility; and for site work for a detention facility.
240 Bed Facility, Roof and HVAC Replacement, Middleton Jail and HOC, Middleton, MA. This project includes roof and HVAC replacement and renovation of the chiller plant and associated trench and pipe work. Accessibility upgrades to one cell unit and one shower stall, crane rail installation and new ADA bench are required. The facility is fully occupied, which will require that work, inside the security perimeter of the correctional facility, be phased. Estimated Cost: $8,323,289 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Category of Work is General Building Construction. Every General Bidder must be certified by DCAMM for no less than the bid price, plus all add alternates, if applicable. *Sub Bid Deadline 1/11/22 Time 12:00 P.M. The applicable minority workforce utilization percentage is 15.3 %. The applicable women workforce utilization percentage is 6.9 %
Post-Bid
Jails / Prisons
$8,323,289.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2022
March 22, 2022
20 Manning Ave, Middleton, MA
Related To This Project
Middleton, MA
Bid Date: Apr 08 2022
Middleton, MA
Bid Date: Oct 02 2023
Middleton, MA
--
Middleton, MA
Bid Date: Dec 21 2023
Middleton, MA
Bid Date: Nov 15 2023
Middleton, MA
Bid Date: Jan 02 2024
Middleton, MA
Bid Date: Dec 18 2023
Middleton, MA
Bid Date: Dec 02 2021
Middleton, MA
Bid Date: Dec 09 2021
Middleton, MA
--
Middleton, MA
Bid Date: Sep 27 2023
Middleton, MA
Bid Date: Aug 31 2023
Middleton, MA
Bid Date: Sep 02 2020
Middleton, MA
Bid Date: Aug 04 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
