Site work and paving for a sidewalk / parking lot in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

BIRCH STREET SIDEWALK IMPROVEMENT & D STREET SIDEWALK IMPROVEMENT bid schedule 1 - birch street mobilization ls water pollution control program ls construction site management ls project identification sign 2 ea clearing and grubbing ls traffic control ls aggregate base, class 2 minor hot mix asphalt concrete plane asphalt concrete pavement cold plane asphalt concrete pavement minor concrete (sidewalk) minor concrete (curb & gutter) minor concrete (curb ramp) minor concrete (driveway) curb outlet - type d-25b roadway excavation imported borrow bmp maintenance cost sharing temporary fiber roll temporary gravel bag temporary cover temporary concrete washout (portable) erosion control (type d) field orders bid schedule 2 - d street project identification sign aggregate base, class minor hot mix asphalt conc place hot mix asphalt (miscellaneous area) cold plane asphalt concrete pavement reconstruct fence, wood (h=3ft) curb outlet - type d-25b 1 ea structural concrete, retaining wall minor concrete (retaining curb) minor concrete (curb ramp) minor concrete (sidewalk) minor concrete (curb & gutter) minor concrete (driveway) roadway excavation bmp maintenance cost sharing 6" thermoplastc traffic stripe thermoplastc pavemnt marking temporary fiber roll 650 lf temporary gravel bag Completion- 40 working days Parking is limited, so be sure to deliver your bids early. Late submission cannot be considered unless there was mishandling on the part of the County of San Diego purchasing staff. Submittals must be received at the Purchasing and Contracting front counter by the identified date and time. If utilizing a courier service or USPS, be advised that all courier service deliveries, including USPS, might be delivered to the Countys central mail room, which may result in late submission and rejection of your bid. Section 3 Requirements and Preferences: The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968 (12 USC Section 1701u) and its associated regulations (24 CFR Part 75) are binding to Contractor and subcontractors. Contractors that seek Section 3 preference shall demonstrate eligibility by submitting the Section 3 Business Concern Certification Form. Section 3 Business Concern Certification Forms must be submitted at the time of bid/proposal. Contractor License Requirements: The Contractor shall possess, at the time the Contract is awarded through Contract acceptance (Contract Code 10164), a California contractor's Class A license. DVB Participation Requirements: In accordance with Board of Supervisors Policy B-39a: Public Works Procurements estimated (by the County) to exceed $1 million: the prime contractor shall meet or exceed 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to exceed $500,000 but not $1 million: the prime contractor shall make a good faith effort to meet or exceed a 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to be $500,000 or less, DVB Subcontractor Participation is encouraged, but not required. DVB participation may be documented on page 2-10, but is not required at this estimate level. Countys Estimate: This public work project is from $ 450,000 to $ 475,000 for Total Bid (Bid Schedule 1 + Bid Schedule 2). Project Location: The project is in the vicinity of Ramona, in the County of San Diego, State of California. Consists in general of construction of concrete sidewalks, curb and gutter, pedestrian ramps and street paving. The project will include, but not limited to street widening including grinding and overlaying. Bid Security: In the form of cash, or a certified or cashier's check, or a Bidder's Bond for at least ten percent of the bid amount executed by a corporation duly authorized to issue bonds in the State of California shall accompany the bid. Performance and Payment Bonds: The successful bidder will be required to furnish a Performance Bond for one hundred percent, and a Payment Bond for one hundred percent of the Contract amount.

Post-Bid

Sidewalks / Parking Lot

$475,000.00

Public - County

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
22
Bidding Soon
718
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

March 4, 2022

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.