BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2021 at 7:00 PM

Updated January 29, 2024

Site work and paving for a sidewalk / parking lot in Mount Vernon, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Jefferson County Board and Sheriff's Office is seeking bids for an infrastructure improvement project involving the following: Asphalting approximately 1,517 square yards of parking area on Jefferson County property located in the northeast corner of S. 9th Street and Casey Avenue in Mt. Vernon, IL. Work to include the following: - Necessary marking of area, removing existing curbs,hauling off debris, and grading total area for elevations and drainage. - Excavation of dirt from an approximately 388 square yard area, plus installing and compacting a stone base to proper elevation. Ensuring smooth introduction into entrances with street and other adjacent surfaces. - Finishing grade base for paving - Stripe total area per parking plan in traffic safety yellow paint. Any interested party wishing to view the project area and more detailed job specifications prior to making a bid needs to contact, the Maintenance Division of the Sheriffs Office at (618) 244-8004, Ext 223, and ask for Randa Rowland.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
68
Bidding Soon
1,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

March 16, 2022

Project location map

S 9th St & Casey Ave, Mount Vernon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.