EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 12, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in El Reno, Oklahoma. Completed plans call for site work for a water / sewer project.

Construction of 10 Inch Bottom Trapezoidal Concrete Ditch Liner All bids must include assurances that the following provisions will be complied with: Federal Labor Standards Provisions, U.S. Department of Labor, 29 CFR 5. Section 3 of the Housing and Urban Development Act of 1974, as amended, 12 U.S.C. 1701U, which requires that, to the greatest extent feasible, opportunities for training and employment be given lower income residents of the project area and contracts for work in substantial part by persons residing in the area of the project. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin or sex, be excluded from participation in, be denied the benefits of or be subjected to discrimination. Certification of Non-Segregated Facilities, which assures the bidder does not maintain or provide any segregated facilities, and comply with the terms of Section 504 and the American with Disabilities Act. Equal Opportunity Provisions - Executive Order 11246, as amended, which assures nondiscrimination. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority-owned business and women-owned businesses to bid on the project. Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. System for Award Management (SAM) registration and a DUNS number is required for CDBG Bidders (Prime Contractors) in order to be awarded projects by the CDBG program. Bidders must go to Sam.gov to complete the registration process. The DUNS number site is website. The Contract Documents may be examined at the following locations: City of El Reno. The time allowed for completion of this project is 150 working days. Liquidated damages for failure to complete the project within the allotted time or authorized extensions thereof, shall be $350.00 per working day.

Bid Results

Water / Sewer

$574,030.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete, Common Work Results for Concrete, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
50
Bidding Soon
488
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

February 10, 2022

img_map_placeholder

Multiple Locations, El Reno, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Johnson Subdivision Block No. 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.