Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a civil project in Mountain Pine, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
The Purpose of This Project Is to Replace Two Structures and Construct Approaches on Approximately 0.656 Mile of County Road 63 in Garland County. This Project Consists of Clearing and Grubbing, Removal and Disposal of Items, Earthwork, Aggregate Base Course, Achm Surface Course, Maintenance of Traffic, Erosion Control Items, One 169'-0" Continuous W-beam Unit Bridge, One 120'-0" Integral Continuous W-beam Unit Bridge, Pavement Marking and Misc. Routes: CR 63 County: Garland Length: 0.656 miles in length This Proposal Contains the Special Provision "establishing Contract Time - Working Day Contract" in Which the Bidder Will Determine the Number of Working Days to Complete the Project. Questions Pertaining to Projects During the Advertisement Period Should Be Addressed to the Program Management Division at Pmd@ardot.gov. the Deadline to Submit a Question Is the Wednesday Prior to the Scheduled Letting Date. a Question Submitted After the Close of Business on the Wednesday Prior to the Scheduled Letting Date May Not Receive a Response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financialassistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Percentage Goal for Disadvantaged Business Enterprise (Dbe) Participation in This Project Is 8.0%. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. AR DOT - Lost Cr and S Fork Little Mazarn Cr Strs and Apprs (S) MBE (16.4%), WBE (6.9%), DBE (8%)
Award
Bridges / Tunnels
$4,353,662.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2022
March 14, 2022
US-63, Mountain Pine, AR
Related To This Project
Mountain Pine, AR
Bid Date: Feb 12 2022
Mountain Pine, AR
Bid Date: Dec 30 2019
Mountain Pine, AR
Bid Date: Aug 05 2019
Mountain Pine, AR
Bid Date: May 06 2019
Mountain Pine, AR
Bid Date: Nov 02 2018
Mountain Pine, AR
Bid Date: Sep 20 2021
Mountain Pine, AR
Bid Date: Feb 22 2024
Mountain Pine, AR
Bid Date: Sep 22 2020
Mountain Pine, AR
Bid Date: Aug 30 2023
Mountain Pine, AR
Bid Date: Jun 20 2023
Mountain Pine, AR
Bid Date: Jun 26 2023
Mountain Pine, AR
Bid Date: May 17 2023
Mountain Pine, AR
Bid Date: May 03 2023
Mountain Pine, AR
Bid Date: Mar 01 2023
Mountain Pine, AR
Bid Date: Jan 08 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.