BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Portland, Maine. Completed plans call for site work for a bridge / tunnel.

**As of January 21, 2022, all bids were under review and the project has not been awarded yet. A timeline for award is not yet determined. The engineer’s estimate is between $1M and $3M. This is for the entire project and includes both the subgrade preparation and culvert repair. Bid Security in the amount of (5%) of the Total Bid shall be submitted with the Bid, The successful Bidder shall furnish: 100% Performance Bond, 100% Payment Bond, Insurance Certificates and begin execution of this contract within ten (10) calendar days following the Notice of Award. All tree clearing shall be completed prior to March 31, 2022. All work for this contract shall be completed no later than October 31, 2022. The work of this contract includes Railroad Subgrade Preparation and Culvert Repair, as described below. All materials supplied for the project shall meet the projects attached Buy America requirements. The Contractor shall procure and maintain insurance coverage as specified in the attached Existing Insurance Requirements document, dated June 2006. NNEPRA shall be listed as an additional insured on all insurance coverages. Additionally, the Contractor shall execute a Railroad Service Agreement, similar to the attached sample agreement, with Pan Am Railways prior to beginning onsite work on this project. Contractor(s) shall coordinate the traffic control for access at grade crossings with MaineDOT and the local municipalities. At crossings where temporary traffic control is required for trucks entering and exiting the project area, the traffic control shall be in accordance with the latest revision of the Manual on Uniform Traffic Control Devices (MUTCD). Proposed Starting Date: April 1,2022 Proposed Finish Date: October 31,2022 Description ofWork: Rehabilitate existing stone box culvert at west end of siding extension at MP 234.2. Stone box culvert is approx. 6 high by 4 wide. In-water work to be conducted between July 15 - Sept. 3C *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$3,000,000.00

Public - Federal

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
739
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

April 6, 2022

img_map_placeholder

To Be Determined, Portland, ME


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.