BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Oswego, New York. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

Reference Number 0000397959 Oswego County's Highway Department is soliciting bids from qualified contractors to furnish all labor and equipment as it pertains to replacing the Maple Avenue Bridge over Little Sandy Creek in the Village of Lacona. The Owner is Oswego County and the work site is located in the Village of Lacona. The projects limits extend from 100 ft. South of the existing bridge and 150 ft. North of the existing bridge. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: removal of existing 32 ft. single span steel multi-girder structure, placement of a new precast concrete 40 ft. span three-sided frame, new precast concrete footings and wingwalls, heavy-stone fill placement, approach work, and guiderail installation. Question Deadline 09/26/2025 at 3:00 PM ET Questions are submitted online No . Questions regarding the Contract Documents should be directed to Oswego County Purchasing Department, either through email at: Purchasing@oswegocounty.com or by telephone at (315) 326- 6052. General Requirements - Insurance Required - Prevailing Wage Required Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The work will be substantially completed within 130 calendar days from the Notice to Proceed or November 30, 2026, whichever comes first. Substantial completion shall mean the project is opened to traffic. Any punch list work shall be completed and final quantities shall be ready for final payment by December 31, 2026. The DBE goal for this project is: 6%. There are no M/WBE or SDVOB goals for this project. The EEO Employment goals for this project are: 3.8% Minority Employment Goal 6.9% Women Employment Goal Oswego County reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the Oswego County Legislature before any award of contract may be made.

Post-Bid

Bridges / Tunnels

$1,895,000.00

Public - County

Demolition, New Construction, Paving, Site Work

45

11

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
146
Bidding Soon
1,480
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

December 8, 2025

Project location map

Maple St, Oswego, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.