Published February 18, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a educational facility.
HVAC Replacements for Coleman College. Engineer's estimated Project Budget: $975,000.00 to $1,125,000 Removal of Existing HVAC System Remove existing OAHU-R.01 with VFD, condensate piping, chill water supply and return piping, wiring and associated controls. Remove Fan Coil Units FCU-P.01, FCU-P02, and FCU-P.03 condensate piping, chill water supply and return piping, wiring and associated controls. Chill water as required both supply and return will be removed to isolation valves. Steam pipe piping to be removed and capped at the 4 th floor mechanical room. Remove the duct riser for OAHU - R-01. Remove the drywall at the shaft wall on the 5 th floor as required and reinstall the duct. Remove existing unit heater and associated controls Installation of New HVAC Equipment Install OAHU-R.01 with VFD, and associated piping, wiring and associated controls to ensure a complete system. Re-flash at the roof curb as required. Install Fan Coil Units per the contract documents. All associated piping, wiring, and controls to ensure a complete system. Install unit heaters per the contract documents associated wiring controls to ensure a complete system. Clean all duct, grills and equipment. Coordination with test and balance and commissioning is required. Touch up finishes if needed and do a final clean of the building and equipment to ensure it is ready for use. Install new controls using (Schneider Electric Ecostuxture System upgrade). Ensure electrical panels are labeled correctly. A lift plan will need to be submitted to the project team to coordinate with the public transportation. Coordination of the removal and replacement of units will be coordinated with Facilities in order to minimize the impact on the school. The Contractor shall be responsible for supplying any Personal Protective Equipment (PPE) necessary to conduct inspection of the work location *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Educational
$769,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 18, 2022
April 1, 2022
1900 Pressler St, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Feb 17 2022
Houston, TX
Bid Date: Nov 22 2021
Houston, TX
Bid Date: Oct 18 2021
Houston, TX
Bid Date: Jan 24 2022
Houston, TX
Bid Date: Feb 03 2022
Houston, TX
--
Houston, TX
Bid Date: Feb 18 2022
Houston, TX
Bid Date: Feb 18 2022
Houston, TX
Bid Date: Feb 07 2022
Houston, TX
--
Houston, TX
--
Houston, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.