BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a educational facility.

HVAC Replacements for Coleman College. Engineer's estimated Project Budget: $975,000.00 to $1,125,000 Removal of Existing HVAC System Remove existing OAHU-R.01 with VFD, condensate piping, chill water supply and return piping, wiring and associated controls. Remove Fan Coil Units FCU-P.01, FCU-P02, and FCU-P.03 condensate piping, chill water supply and return piping, wiring and associated controls. Chill water as required both supply and return will be removed to isolation valves. Steam pipe piping to be removed and capped at the 4 th floor mechanical room. Remove the duct riser for OAHU - R-01. Remove the drywall at the shaft wall on the 5 th floor as required and reinstall the duct. Remove existing unit heater and associated controls Installation of New HVAC Equipment Install OAHU-R.01 with VFD, and associated piping, wiring and associated controls to ensure a complete system. Re-flash at the roof curb as required. Install Fan Coil Units per the contract documents. All associated piping, wiring, and controls to ensure a complete system. Install unit heaters per the contract documents associated wiring controls to ensure a complete system. Clean all duct, grills and equipment. Coordination with test and balance and commissioning is required. Touch up finishes if needed and do a final clean of the building and equipment to ensure it is ready for use. Install new controls using (Schneider Electric Ecostuxture System upgrade). Ensure electrical panels are labeled correctly. A lift plan will need to be submitted to the project team to coordinate with the public transportation. Coordination of the removal and replacement of units will be coordinated with Facilities in order to minimize the impact on the school. The Contractor shall be responsible for supplying any Personal Protective Equipment (PPE) necessary to conduct inspection of the work location *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$769,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
55
Bidding Soon
2,727
All Active Projects
1,114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

April 1, 2022

img_map_placeholder

1900 Pressler St, Houston, TX


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.