Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 17, 2021 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Springfield, Illinois. Contact the soliciting agency for additional information.

ILSOS is entering into a change order with Keith Engineering to extend the current term through June 30, 2022 to finalize this project. There is no additional cost and this is just a 6 month extension. These changes were not foreseeable at the time of contract execution The method of Contractor Selection has not been Determined at this time

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
52
Bidding Soon
1,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2021

January 28, 2022

Project location map

To Be Determined, Springfield, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed