BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Council Bluffs, Iowa. Completed plans call for the renovation of a 9,700-square-foot educational facility.

Project Number- 2021-159 https://nonpareilonline.com/news/education/bluffs-school-board-approves-work-on-projects-accepts-in-kind-donation/article_f4e58420-7fa4-11ec-9988-5fa6aab74aee.html - The board also approved an agreement to pay BVH Architects $98,200 for design work on the renovation of the Abraham Lincoln High School Auditorium and lobby. Plans are to give the auditorium entrance and lobby a facelift. The project will include setting off the entrance from the hallway with a contrasting dark ceiling and wood slat wall, with holders for event posters in the wall. New doors will be installed. Display cases across the hall will be outfitted with new lighting and a tackable back wall to offer more display options. Inside the auditorium, wood slats will be added next to the stage, walls will be painted, acoustical panels will be installed and carpet and curtains will be replaced. In addition, theatrical rigging and lighting will be upgraded, water damage to the ceiling will be repaired and a screen and projector will be installed. BVH estimated the total cost of the project at just over $1 million. The school district hopes to have the project completed over summer break. ______________________________________________________________________________________________________________________________________________ Project Description: Renovation of the existing Auditorium and Corridor Lobby at Abraham Lincoln High School, located at 1205 Bonham Street, in Council Bluffs, Iowa. The project consists of approximately 8500 sq. ft. of renovations of the existing Auditorium (main floor, balcony, and stage). The project also includes 1200 sq. ft. of renovation of the existing Corridor Lobby, the entrance to the Auditorium. The renovation scope includes, but is not limited to the following: New paint, flooring, doors, ceilings, glass railings at the balcony, wood panel system, mechanical diffusers, concealed fire sprinkler heads, light fixtures, wood flooring refinishing at the stage, plaster repair (and paint) at the ceiling clouds, etc. Design includes engineering for Electrical and Technology design.

Award

Educational

$705,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
95
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

June 6, 2022

Project location map

1205 Bonham St, Council Bluffs, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.