Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 4, 2022 at 7:00 PM
Updated November 15, 2023
Demolition and site work for a residential development in Coal Valley, Illinois. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Bid documents can be downloaded at website. 105 1st Street Coal Valley, Illinois 107 1st Street Coal Valley, Illinois The Village of Coal Valley is seeking bids to demolish a two-story residential home and garage at 105 1st Street Coal Valley, IL and a one-story residential home and 2 garages at 107 1st Coal Valley, IL. Bid documents can be downloaded at www.coalvalleyil.org or picked up at the Village Hall 900 1st Street, Coal Valley, IL. Bids must be received at the Office of the Village Clerk prior to 10:00 am Thursday January 13, 2022. Village of Coal Valley, Illinois, will receive sealed Bids on Contract for Demolition. The base bid consists of the demolition and removal of a 2-story structure commonly known as 105 1 st Street size approximately 36 x 24 wood frame w/basement construction, 1 - garage size approximately 24 x 30 and existing garage floor 1 - driveway 2000 sq ft 1 - patio 200 sq ft and remove all trees, stumps and bushes. The demolition and removal of a 1-story structure commonly known as 107 1 st Street size approximately 39 x 43 wood frame w/crawl space, 2 garages - 1 - garage approximately 22 x 22 1 - garage approximately 24 x 30 and existing garage floors 1 - driveway 2180 sq ft remove all trees, stumps, bushes and existing wood fencing. All demo shall be done by March 4th, 2022 with both sites cleared and backfilled with proper storm water and ditch drainage. 10% will be held back for the seeding/grading and shall be done by April 30th, 2022 for the entire demolition package to be paid out and completed.
Award
Residential Subdivision
$57,629.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed